Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 73-PrePower F.pdf
g]UNIVERSAL@ ENGINEERING SCIENCES Inspection Date: ! U Project: Address: �J a 3 5 INSPECTION RESULTS - 0\ I Permit No. 73 �Dlf — c�lc/ ( Check one: }( Regular Inspection: / 'El Reinspection Date of Initial Inspection: / b ` /'% 6q Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Slab Underground Floor Rough -In Underground Rough -In Duct Rough -In Steam Piping & Test Masonry Wall/Ceiling Wall Rough -In Ceiling Rough -In Stack Piping & Test Water Piping & Test HW Piping &Test CHW Piping &Test Framing Structural Panel/Feeder Service/Ground Gas Piping &Test Storm Piping & Test Cond. Piping &Test Insulation Sheet Rock Roofing Appliance/Equipment Lighting Protection Fixtures Equipment Wall & Ceiling Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: /' Area Inspected/Code: .1 �y o Ohl err ( D w Inspection Results: ❑ pP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed \iE�' DP -Disapproved ❑ Not Ready P�,J 3. 4. 5. 6. 7. Inspector's Name: / UcJkAl OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com