HomeMy WebLinkAboutCreekside Lot 21-Slab.pdf®UNIVERSAL'
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: ((l� 0 - /q -
Project: /1 D 0 1/. A 4,e U�
Address: r
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
Permit No
9/
�/Z)5- 079/
0-Y-9/
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
ANICAL
Footing
Underground
Underground
ough-In
Slab
FUR
Floor Rough -In
Rough -In
Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
ping & Test
Wall/Ceiling
Water Piping & Test
iping & Test
Framing
Panel/Feeder
Gas Piping & Test
Piping & Test
FFinalMechamcal
Structural
Service/Ground
Storm Piping & Test
ion
Sheet Rock
Appliance/Equipment
Fixtures
Ceiling
Roofing
Lighting Protection
Equipment
ent
Re -inspection
Re -inspection
Re -inspection
ection
d
Final Building
Final Electrical
Final Plumbing
�—
echanical
Other Inspection Type
Area Inspected/Code:
--ram
Inspection ResultP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
tP-Disaooroved F1 Nnt Randv
Conc
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: ��i 4-4 / Lic.#: I 277
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com