Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 1-Soffit Rough Frame.pdf
[BUNIVERSAL' ENGINEERING SCIENCES Inspection Date: _ Project: l /UFO Address: 3 y 5 INSPECTION RESULTS `� I Permit No. Check one: e1�`� Regular Inspection: �❑ Reinspection Date of Initial Inspection Inspection Type Requested (check): 0 ,21of- 0870 D-q - BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -in Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing I I Final Mechanical Other Inspection Type: � Area Inspected/Code: l7 Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed �DP-Disapproved El Not Ready JL— Conditions/Comments: / �C� / / 4�C✓ 1. 2. 3. 4. 5. 6. 7. Inspector's Name: /Lic.#: Y/ 7? 5 Z OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com