Loading...
HomeMy WebLinkAboutCreekside Lot 94-Mullions NR.pdf®UNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: I d - 1 f L��/ Permit No. O � b ( —© / 3/ Project: % Address: 3 3 Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: o Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: /9- ,Cd Inspection Results: P-Approved ❑ AE-Approved with Exceptions -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. OFFICES THROUGHOUT FLORIDA ❑ DA-Disallowed 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com