Loading...
HomeMy WebLinkAboutCreekside Lot 14-Soffit Rough Frame NR.pdf[BUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS LAM Inspection Date: I o -0%/ Permit No. )/ e 7 Project: • � � - �Zl�iflk% «Irk Check one: 13L Regular Inspection: �❑ Reinspection Date of Initial Inspection: OV Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures I Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: / !Z b Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed P-Disapproved ❑ Not Ready n Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com