Loading...
HomeMy WebLinkAboutCreekside Lot 109-Column.pdf[BUNIVERSAL® ENGINEERING SCIENCES INSPECTION RESULTS r Inspection Date: �Permit No. Project: Address: `l de Check one: Regular Inspection: ❑ Reinspection t,6_ - /0 ? a le 3- 08" y� Date of Initial Inspection: / C) - —a / Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground I Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Lighting Protection Equipment Equipment tRoofing Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: C Inspection Results: P-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed DP -Disapproved ❑ Not Ready Conditions/Comments: S 1. 2. 3. 4. 5. 6. 7. Inspector's Name: 6LI Lic.#: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com