HomeMy WebLinkAboutAPPROVED SGD770NOANOA No. 20-0429.09
Expiration Date: February 17, 2025
Approval Date: October 15, 2020
Page 1
MIAMI-DADE COUNTY
PRODUCT CONTROL SECTION
11805 SW 26 Street, Room 208
DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) Miami, Florida 33175-2474
BOARD AND CODE ADMINISTRATION DIVISION T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy
PGT Industries, Inc.
1070 Technology Drive,
North Venice, Fl. 34275
SCOPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The
documentation submitted has been reviewed and accepted by Miami-Dade County RER -Product Control Section to be
used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section
(In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this
product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted
manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or
suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this
acceptance, if it is determined by Miami-Dade County Product Control Section that this product or material fails to
meet the requirements of the applicable building code.
This product is approved as described herein and has been designed to comply with the Florida Building Code,
including the High Velocity Hurricane Zone.
DESCRIPTION: Series “SGD-770” Aluminum Sliding Glass Doors w/ 900 & 1350 corners –L.M.I.
APPROVAL DOCUMENT: Drawing No. PGT0130 Rev D, titled “Series 770 Alum. SGD - LM Impact”, sheets 1
through 22 of 22, dated 10/10/14 and last revised on 04/22/20, prepared by manufacturer, signed and sealed by
Anthony Lynn Miller, P.E., bearing the Miami-Dade County Product Control Revision stamp with the Notice of
Acceptance number and expiration date by the Miami-Dade County Product Control Section.
MISSILE IMPACT RATING: Large and Small Missile Impact Resistant
Limitations:
1.Max eight (8) panels configuration unit is allowed, having max nominal panel size not to exceed tested height &
width per tables 1 thru 3. See sheets 6, 7 and 8 for Design Pressures (DP), glass types, Sill type for Positive DP
limits, applicable Standard or Heavy-Duty parts and anchorage requirements. See Typ. Installation in sheet 10 for
straight configured units, sheet 11 for corner units and sheet 14 for pocketed units. Pockets & Egress requirements
to be reviewed by Building official.
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and series and
following statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change
in the applicable building code negatively affecting the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the
materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product,
for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section
of this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the
expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done
in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and
shall be available for inspection at the job site at the request of the Building Official.
This NOA renews NOA # 19-1126.03 and consists of this page 1 and evidence pages E-1, E-2, E-3 & E-4, as well as
approval document mentioned above.
The submitted documentation was reviewed by Ishaq I. Chanda, P.E.
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0429.09
Expiration Date: February 17, 2025
Approval Date: October 15, 2020
E - 1
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
1.Evidence submitted under previous approvals under file #15-1013.15
A. DRAWINGS
1. Manufacturer's die drawings and sections (submitted under files See below)
2.Drawing No. PGT0130, titled “Series 770 Alum. SGD – LM Impact”, sheets 1 through 22 of
22, dated 10/10/14, with revision A dated 10/08/15, prepared by manufacturer, signed and
sealed by Lynn Miller, P.E.
B. TESTS
1.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked-up drawings and installation diagram of an aluminum sliding glass door, prepared
by Fenestration Testing Laboratory, Inc., Test Report No. FTL-7554, dated 11/01/13, signed and
sealed by Marlin D. Brinson, P.E.(Submitted under NOA No. 14-0123.10)
2.Test reports on: 1) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked-up drawings and installation diagram of an aluminum sliding glass door, prepared
by Fenestration Testing Laboratory, Inc., Test Reports No.:
FTL-5980-R, FTL-6001-R and FTL-6015-R, which have been revised and reissued on 12/29/09, all
signed and sealed by Julio Gonzales, P.E. (Submitted under NOA No. 09-0826.10)
Along with marked-up drawings and installation diagram of an aluminum sliding glass door,
prepared by Fenestration Testing Laboratory, Inc., Test Reports No.: FTL-5980, FTL-5993, FTL-
6036, FTL-6001, FTL-6014, FTL-6015, FTL-6017, FTL-6023, FTL-6024, FTL-6025, FTL-6028,
FTL-6031, FTL-6033 and FTL-6036, all dated 08/10/09 and signed and sealed by Julio Gonzales,
P.E. (Submitted under NOA No. 09-0826.10)
3.Additional, Reference Fixed window test report FTL-7897 (cardinal spacer) per TAS 201, 202 &
203-94, issued by Fenestration Testing lab (Test report submitted under file #15-0430.08)
C. CALCULATIONS
1.Anchor verification calculations and structural analysis, complying with FBC-5th Edition
(2014), dated 01/30/15, prepared by manufacturer, signed and sealed by Anthony Lynn
Miller, P.E.
2.Glazing complies with ASTM E1300-04
D. QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER).
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0429.09
Expiration Date: February 17, 2025
Approval Date: October 15, 2020
E - 2
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 14-0916.10 issued to Kuraray America, Inc. for their “Butacite®
PVB Glass Interlayer” dated 04/25/15, expiring on 12/11/16.
2.Notice of Acceptance No. 14-0916.11 issued to Kuraray America, Inc. for their “SentryGlas®
(Clear and White) Glass Interlayers” dated 06/25/15, expiring on 07/04/18.
F.STATEMENTS
1.Statement letter of conformance, complying with FBC-5th Edition (2014), dated October 8, 2015,
issued by manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
G. OTHERS
1.Notice of Acceptance No. 14-0128.11, issued to PGT Industries, Inc. for their Series “SGD-770”
Aluminum Sliding Glass Doors w/90° &135° corners - L.M.I. expiring on 02/17/20.
2.Evidence submitted under previous approvals under file #16-2609.06
A. DRAWINGS
1.Drawing No. PGT0130, titled “Series 770 Alum. SGD – LM Impact”, sheets 1 through 22 of 22,
dated 10/10/14, with revision B dated 05/05/16, prepared by manufacturer, signed and sealed by
Anthony Lynn Miller, P.E.
B. TESTS
1.Reference Test report on 1) Uniform Static Air Pressure Test, per FBC, TAS 202-94
2) Large Missile Impact Test per FBC, TAS 201-94
3) Cyclic Wind Pressure Loading per FBC, TAS 203-94
Along with marked-up drawings and installation diagram of Aluminum Sliding Glass Doors (w/
PS, Super, Cardinal & Duraseal Spacers), prepared by Fenestration Testing Laboratory, Inc., Test
Reports No(s) FTL-8717, FTL-8970 and FTL-8968, dated 02/15/16, 06/07/16 and 06/20/16, all
signed & sealed by Idalmis Ortega, P.E.
C. CALCULATIONS (Submitted under previous NOA)
1.None.
D. QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER).
E.MATERIAL CERTIFICATIONS
1.None.
F.STATEMENTS
1.Statement letter of conformance, complying with FBC-5th Edition (2014), dated October 8, 2015,
issued by manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
2. Test proposal No. 16-0152 dated 03/09/16 approved by RER.
G. OTHERS
1.Notice of Acceptance No. 15-1013.15, issued to PGT Industries, Inc. for their Series “SGD-770”
Aluminum Sliding Glass Doors w/90° &135° corners - L.M.I., expiring on 02/17/20.
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0429.09
Expiration Date: February 17, 2025
Approval Date: October 15, 2020
E - 3
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
3.Evidence submitted under previous approvals under file #17-0420.12
A. DRAWINGS
1.Drawing No. PGT0130, titled “Series 770 Alum. SGD – LM Impact”, sheets 1 through 22 of 22,
dated 10/10/14, with revision C dated 04/05/17, prepared by manufacturer, signed and sealed by
Anthony Lynn Miller, P.E.
B. TESTS
1. None.
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC-6th Edition (2017),
dated 04/18/17 and revised on 08/10/17, prepared by manufacturer, signed and sealed by Anthony
Lynn Miller, P.E.
2.Glazing complies with ASTM E1300-09
D. QUALITY ASSURANCE
1.Miami-Dade Department of Regulatory and Economic Resources (RER).
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 16-1117.01 issued to Kuraray America, Inc. for their “Trosifol®
Ultraclear, Clear and Color PVB Glass Interlayers” dated 01/19/17, expiring on 07/08/19.
F.STATEMENTS
1. Statement letter of conformance with FBC-6th Edition (2017), dated 08/10/17, issued by
manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
G. OTHERS
1.Notice of Acceptance No. 16-0629.06, issued to PGT Industries, Inc. for their Series “SGD-770”
Aluminum Sliding Glass Doors w/90° &135° corners - L.M.I., expiring on 02/17/20.
4. Evidence submitted under previous approval.
A. DRAWINGS
1. Drawing No. PGT0128 Rev C, titled “Series 670 Alum SGD-Non-Impact”, sheets 1 through 22
of 22, prepared by manufacturer, dated 02-02-14 and last revised on 11/22/19, signed and sealed
by Lynn Miller, P.E.
C. CALCULATIONS (submitted under file #17-0420.12)
1. None
D. QUALITY ASSURANCE
1.Miami Dade Department of Regulatory and Economic Resources (RER).
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc. for their “Trosifol®
Ultraclear, Clear and Color PVB Glass Interlayers”, expiring on 07/08/24.
2.Notice of Acceptance No. 17-0808.02 issued to Kuraray America, Inc. for their “SentryGlas®
(Clear and White) Glass Interlayers”, expiring on 07/04/23.
F.STATEMENTS
1.Statement letter of conformance to FBC 2017 (6th Edition) and letter of no financial interest,
prepared by PGT, dated 11/22/19, signed and sealed by Lynn Miller, P.E.
G. OTHER
1.This NOA renews NOA # 17-0420.12, expiring April 07, 2025.
Ishaq I. Chanda, P.E.
Product Control Unit Supervisor
NOA No. 20-0429.09
Expiration Date: February 17, 2025
Approval Date: October 15, 2020
E - 4
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
5.New Evidence submitted
A. DRAWINGS
1. Drawing No. PGT0130 Rev D, titled “Series 770 Alum. SGD - LM Impact”, sheets 1 through 22
of 22, dated 10/10/14 and last revised on 04/22/20, prepared by manufacturer, signed and sealed
by Anthony Lynn Miller, P.E.
B. TESTS
1.Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4)Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
along with marked-up drawings and installation diagram of all PGT Industries, Inc. representative
units listed below and tested to qualify Dowsil 791 and Dowsil 983 silicones, prepared by
Fenestration Testing Laboratory, Inc., Test Reports No.:
FTL-7897, PGT PW5520 PVC Fixed Window (unit 6 in proposal), dated 09/03/14
FTL-20-2107.1, PGT SGD780 Aluminum Sliding Glass Door (unit 7 in proposal) FTL-20-2107.2,
PGT CA740 Alum. Outswing Casement Window (unit 8 in proposal) FTL-20-2107.3, PGT
PW7620A Aluminum Fixed Window (unit 9 in proposal) and FTL-20-2107.4, PGT PW7620A
Aluminum Fixed Window (unit 10 in proposal) dated 07/13/20, all signed and sealed by Idalmis
Ortega, P.E.
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC 7th Edition
(2020), dated 03/26/20, prepared by manufacturer, signed and sealed by Anthony Lynn
Miller, P.E.
2. Glazing complies with ASTM E1300-04, -09, -12 and -16.
D.QUALITY ASSURANCE
1.Miami Dade Department of Regulatory and Economic Resources (RER).
E.MATERIAL CERTIFICATIONS
1.Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc. for their “Trosifol®
Ultraclear, Clear and Color PVB Glass Interlayers”, expiring on 07/08/24.
2.Notice of Acceptance No. 17-0808.02 issued to Kuraray America, Inc. for their “SentryGlas®
(Clear and White) Glass Interlayers”, expiring on 07/04/23.
F.STATEMENTS
1.Statement letters of conformance to FBC 2020(7th Edition), dated 03/26/20, prepared, signed &
sealed by Lynn Miller, P. E.
G. OTHER
1.This NOA revises NOA #19-1126.03, expiring 02/17/25.