Loading...
HomeMy WebLinkAboutNewton Scope Of Work(1) 6118 SE Federal Highway Stuart, FL 34977 Tel: 772.288.6255 art Fax: 772.286.2072 eamMa er Bath & Kitchen Wes & Kim Newton 9550 S. Ocean Drive Unit#102 Jensen Beach, FL 34957 We propose to furnish all labor and material to remodel your KITCHEN. Our Scope of Work includes the following 1. Designs 2. Permitting 3. Job supervision 4. Floor and dust protection 5. Demo: *Kitchen cabinets, counter tops, disconnect plumbing, and remove appliances. *Cut down wall separating kitchen & hallway. *Remove wall at washer& dryer. *Remove drop ceiling in Kitchen. *Remove Soffit at pass through above sink. *Remove popcorn ceiling throughout main area & bedrooms. *Remove all tile flooring in kitchen & halls. Remove carpet in Living Room 6. Debris removal fees 7. Interior walls: Add framing/deadwood for drywall where necessary Fur down ceiling& install drywall for low profile LED Can lighting in kitchen Repair drywall in the following areas: Where wall at pass through is removed Where walls & ceiling was removed Where ceiling popcorn has been removed 8. Plumbing: Install the following: Sink: Blanco Precis Silgranit 13/ bowl undermount kitchen sink Faucet: Kohler Bellera Kitchen Faucet Soap Dispenser Air switch for disposal Garbage Disposal Disposal Flange Strainer Sink& Dishwasher to stay in same location 9. Electrical: ALL NEW WORK TO MEET CURRENT NEC CODES Kitchen/Laundry: Update outlets & switches in same locations in backsplash g Add receptacle right of stove to satisfy code Can lighting to replace fluorescent strips Relocate all wiring in walls in cut down and removed areas """ Eliminate phone hack I rVamMa .er Add GFCI, tamper proof outlet per code at Peninsula area at 1 tc e n Relocate washer/dryer outlet to allow for proper access Coffee Bar(by front of condo window) Relocate existing low outlets to above counter height Hallway at front entry Install 3 "Slim" LED can lights in entry hallway in hallway, replacing existing lighting 10. Cabinets: Install new Showplace Wood Products per design drawings 11. Granite material: Install 3cm 1%" thick Blue Flower Granite 12. Tile & Flooring: Backsplash: MSI Blue Shimmer Arabesque Grout: Quartz Lock Sea Blue Flooring (TILE): Tile: General Ceramic Kiel Taupe 8"x48" (polished/rectified) Locations: Living Room, Dining Room, Guest Hall, Foyer Hall, Kitchen, & Guest Bedroom Closet Flooring (CARPET): Install the following carpet: Carpet: Masland Mesa Bella Locations: Master Bedroom & Guest Bedroom (no closets) 13. Trim: Install: Crown molding in the living room only. Base Molding to be installed throughout all areas where tile floor is installed Door Casing at entry closet 14. Paint: Ceilings— Master bedroom, living room, guest bedroom, hallway and kitchen Walls - Master bedroom, living room, guest bedroom, hallway All trim & doors— Base board & doors & casing & living room crown molding: Front door, master bedroom, living room, guest bedroom, hallway and kitchen 15. Daily clean-up &final clean by cleaning crew