HomeMy WebLinkAboutCreekside Lot 126-Sewer Connect.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: t/ (o `� Permit No. 01 l J
Project: QQ
Address ^. / 10 ti Lr� VYl B l)24
1
Check one:
ARegular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
I Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
I
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
4 //
Area Inspected/Code: 5 __Ut �A Ln .7n iQC,/ p17,
Inspection Results: AP -Approved I-]AE-Approved with Exceptions ❑ DA-Disallowed
4P-Disapproved ❑ Not Ready
Conditions/Comments: ra
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: Lic.#: mmw & 7 7✓ 2
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com