Loading...
HomeMy WebLinkAboutCreekside Lot 120-Temp Toilet.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: I �(� a Permit No Project: q Address: L S a U Check one: XRegular Inspection: /,f is ElReinspection Date of Initial Inspection: % � � - (9/ Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Codee/// _ Inspection Results: qp AP -Approved ElAE-Approved with Exceptions ElDA-Disallowed DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: i7/% �(N Lic.#: Al -2/ J Z OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com