Loading...
HomeMy WebLinkAboutCreekside Lot 120-Sewer Connect.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS 0-1 c) Inspection Date: I % P �, JI Permit No. Project: Address: 5 0 Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: Y 1-1 rJ — D5 vL/rLQt-Jt_" Inspection Results: AP -Approved ❑ AE-Approved with Exceptions ElDA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. UQ/ Inspector's Name: Lic.#: ham'" _275 2— OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com