Loading...
HomeMy WebLinkAboutProject InformationSt. LUCIE WORKS Section-D (Steep Slope Roof System) Roof System Manufacturer: Notice of Acceptance Number: Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1:Zone 2e:_Zone 2n:_Zone 2r:^Zone 3e:one 3r: Roof. Slope: (L: 12 Ridge Ventilation? Deck Type: Type Unde1ayment: 8 Insulation: Fire Barrier: Fastener Type & Spacing: Adhesive Type: Type Cap Sheet Mean RooPHelght: Roof-Covedng: Type & Size Drip Edge: } ST. LUCIE WORKS Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mf. If the Mf values are greater than or equal to the Mrvalues, for each area of the roof, then the the attachment method is acceptable. Method 1'Moment Based Tile Calculations Per RAS 12T (Zone 1: x _ Mg: _ Product Approval Mi (Zone 2e: x1l = `�-iNg: =M,2. Product Approval Mf. (Zone 2n: x2 = )-Mg: =Ma, Product Approval Mf (Zone 2r: Xl . ---)-Mg: =M& Product Approval Mf (Zone 3e: Product ApprovalMf (Zone3r: MM =Mr& Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Product Approval Mf Mr required Moment Resistance* Mean Roof Height Roof Slope 15' 20' 25' 30' 40' 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment based the systems • For Uplift based 'tile systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: x L =x W:= -W: cos r =Fn Product Approval F' ' (Zone 2e: x L =x W:=-W: cos r =Fr2e Product Approval F' (Zone 2n: • x L =x W:= ) -W: cos r =Fr2n Product Approval F' (Zone 2r: x L =x W:=-) -W: cos r =Fr2r Product Approval F' (Zone 3e: x L =x W:=____j -W: cos r =Fr3e Product Approval F' (Zone 3r: x L =x W:=____j -W: cos r =Fr3r Product Approval F' Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope 8 Job Site Aerodynamic Multiplier Product Approval Restoring Moment due to Gravity Me Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Mg Calculated Minimum Attachment Resistance F' Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L= length W=width Product Approval All calculations must be submitted to the building official at the time of permit application. j ST. LUCIE WORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer:T�'+1 LO Product Approval No.:_ao — 0`76) , D 2— Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': Zone 1 Zone 2: Zone 3: Max. Design Pressure, from the specific product approval system: Deck: Type: Gauge Thickness:, Slope:, Anchor/Base Sheet & No, df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply -Sheet Fastener/Bonding Material: ;Top Ply: Top Ply Fastener/Bonding Material: t Surfacing: { Fastener Spacing for Anchor/Base Sheet Attachment: Zone V, " oc @ Lap, # Rows @ ° ac Zone 1:�." oc @ Lap, # Rows @ ° oc Zone 2:—" oc @ Lap, # Rows @ "ao Zone 3:—" oc @ Lap, # Rows @ moo Number of. Fasteners Per Insulation Board: l Zone V —Zone 1: Zone 2: Zone 3: 1 Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, °yam Counterflashirig, Coping, Etc.., Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, FastenerSpacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. Roof Total Roof Area - 36.88 SQ Standard Slope (4:12-6:12) - 36.83 SQ Flat`Slope (o:1-2 1 12)` 0:05::SQ , Roof Planes - 13 Structures - 1 Eave - 179.50 LF Rake 108-00 LF. Total Perimeter - 287.50 LF Ridge . - 64.97:1-17 Hip - 129.79 LF Valley - 111.18 LF . Slope Change - 2.00 LF Step.Flashing - 19.68. LF Headwall Flashing - 21.44 LF 6759 Dickinson Terrace, Port St. Lucie, FL 34952 North South East West THIS REPORT IS FOR ESTIMATION PURPOSES ONLY. VERIFY ALL DIMENSIONS AND TOTALS BEFORE PURCHASING MATERIALS. I THIS REPORT IS THE PROPERTY OF SCOPE TECHNOLOGIES, INC. AND MAY NOT BE REPRODUCED WITHOUT WRITTEN 'CONSENT. • o • • - • - (OScope Tech nologi - 11630 StoutDenver CO 802021•• ••- • ••- 1 1 Drafted • Roof Area Analysis - Structure 1 6759 Dickinson Terrace, Port St. Lucie, FL 34952 11.6 Lq m v n 11.6 SP 12.5 Ln Plane Area(sf) Pitch ( Slope A 664 5:12 B 687 5i12 C 196 5:12 D 45 5:1Z E 1,055 5:12 F 70;:. 51Z G 375 5:12 H 49 . 5:12 1 47 5:12 J 5. 112 F K 40 5:12 G- 144 5:12`,_ . M 311 5:12 Slope: (S)teep - Qmv - (F)Iat Totals (SQ) 1:12 - 0.1 5:12 - 36.8 Flat - 0.1 Drawing Key 0.4 0.4 12.5 12.5 Eave Hip Ridge Parapet Clear Story ----- Headwall Flashing \\\Ice & Water Areas -- Rake Edge Valley Flat Drip Edge Coping ----- Slope Change - Step Flashing «Flat Slope Area RoofScope Report (OScope Technologies, Inc. 11630 Stout St., Denver CO 80202 1 www.roofscope.com 1877-MyScope 1 11/16/20 1 Drafted b : MMJ I p.2/2