HomeMy WebLinkAboutCreekside Lot 26 Dry-In_Tin Tab.pdf[BUNIVERSAL®
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: n/ o ^ I? • b9l Permit No
Project: Xn
Address: 34/ 3c I ,
Check one:
kRegular Inspection:
�/oj Oel) to
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
I
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing I
I
Final Mechanical
Other Inspection Type: / n
Area Inspected/Code: / 3 L i -.titA�4 17 i44
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved Not/Ready
Conditions/Comments: -e/eppc
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: /� d/ ��/(� Lic.#: /�/i/ 2-7 S2
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com