Loading...
HomeMy WebLinkAboutCreekside Lot 26 Dry-In_Tin Tab.pdf[BUNIVERSAL® ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: n/ o ^ I? • b9l Permit No Project: Xn Address: 34/ 3c I , Check one: kRegular Inspection: �/oj Oel) to ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment I Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing I I Final Mechanical Other Inspection Type: / n Area Inspected/Code: / 3 L i -.titA�4 17 i44 Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved Not/Ready Conditions/Comments: -e/eppc 1. 2. 3. 4. 5. 6. 7. Inspector's Name: /� d/ ��/(� Lic.#: /�/i/ 2-7 S2 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com