HomeMy WebLinkAboutCreekside Lot 110 Insulation.pdfg]UNIVERSALc
ENGINEERING SCIENCES
INSPECTION RESULTS
tc-l" i / D
Inspection Date: Permit No. / C) D p
Project: q /
Address: / y0 o
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
L
Footing
Underground
Underground
n
Slab
Floor Rough -In
Rough -In
& Test
Masonry
Wall Rough -In
Stack Piping & Test
Test
SPiping
JHW
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
Test
Framing
Panel/Feeder
Gas Piping & Test
& Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results: AP -Approved ElAE-Approved with Exceptions
�IDP-Disapprovecl ❑ Not Ready
Conditions/Comments: ,00c A/1A
2.
3.
4.
5.
6.
7.
Inspector's Name:
Lic.#: 15/// G ! S-Z
❑ DA-Disallowed
/rw-(/�, GA95-
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com