HomeMy WebLinkAbout21-145A - OHS Condos-N Bldg-Bldg A- SLCPermit 2106-0287 - Report 02 10.01.21 DSIGNEDM L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145A Report No. 2
Project Manager:
Building Official:
Contractor:
File:
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR SOUTH CONDOMINIUMS – 2021 BALCONY REPAIRS
4250 N. HWY A1A – (NORTH BLDG – BLDG. A) – FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 2106-0287
PROJECT NAME: Ocean Harbor South Condos – 2021
Balcony Repairs – N. Bldg. / Bldg. A DATE: October 1, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Unit 808 – Balcony Demo
OBSERVATIONS:
• Shoring has been placed at the south and east edge from the 5th floor up to the bottom of the 9th floor slab.
• A temporary weather wall has been placed across both sliding glass door (SGD) openings.
South-Facing sliding glass door
• The SGD has been removed.
• Loose concrete has been removed and corroded reinforcing bars exposed.
• (6) post tension (PT) cables in total were found running parallel under the sliding glass door track in the east to
west direction. (3) cables are directly under the track and the other (3) are inside the unit.
• The steel reinforcing bars above and below the PT cables under the SGD track were found to have major
corrosion and many of the bars will require replacement.
RECOMMENDATIONS:
• Contractor to contact the post tension specialist for recommendations to splice and replace the broken cables.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten, Inspector
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-145A Report No. 2
Project Manager:
Building Official:
Contractor:
File:
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Robert Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 2 of 2
Pic 1
(6) post tension cables under south facing SGD
Pic 2
Column spall at the northeast corner of the balcony.
Reinforcing bars to be repaired and replaced as per
specs.
Pic 3
South sliding glass door
There was approximately 1-1/4” concrete cover above
the PT cables