Loading...
HomeMy WebLinkAboutCreekside Lot 19 Bond Beam.pdf[BUNIVERSALE ENGINEERING SCIENCES INSPECTION RESULTS lerl " Inspection Date: Permit No. / b 5 b D -7/ Project: Address: Check one: ���,Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping& Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: 1 2 Area Inspected/Code: Inspection Results: ❑ AP -Approved AE-Approved with Exceptions ❑ DA-Disallowed DP -Disapproved of Ready Conditions/Comments: 4�0 ' S 1. 2. 3. 4. 5. 6. 7. Inspector's OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com