Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 96 Truss.pdf
[BUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: �0 PR ^(�Dr9 � Permit No. oy 7 li / Project: r� 0 D _' (114 � _G Address: Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: n) -8� . J4 Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area inspected/Code: l 7 L Inspection Results: P-Approved ❑ AE-Approved with'E cceptions DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 4. 5. 6. 7. OFFICES THROUGHOUT FLORIDA ❑ DA-Disallowed 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamafa.com