HomeMy WebLinkAboutIn Place Density Test ReportUES Project No:
Workorder No:
Report Date:
3360.1900044.0000
248561-1
10/13/2021
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In-Place Density Test Report
Client:HOMES BY ABURTON, LLC UES Technician:Mark Rogers
RA Construction of the Treasure Coast Attn: Don Warburton
Stuart, FL 34994
Date Tested:10/12/2021
Project:HOMES BY ABURTON LLC
Various Locations, , TBD County, FL
Type of Test:
Area Tested:7153 Gullotti Place, PSL Field:ASTM D-6938 Nuclear Gauge Method
Material:Backfill Laboratory:ASTM D1557 Modified Proctor
Reference Datum:0 = Top of Fill
The tests below meet the 95% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Pass
or
Fail
1 Northeast corner of lot 0-1 ft 111.4 11.2 108.2 10.7 97 Pass
2 Southwest corner of lot 0-1 ft 111.4 11.2 108.5 10.4 97 Pass
3 Center of lot 0-1 ft 111.4 11.2 109.0 10.9 98 Pass
Remarks:Permit # SLC2106-0267
Reviewed By
GFA International, Inc
FBPE Registry No.4930
Allan G. Abubakar, P.E.
STATE OF FLORIDA
Professional Engineer No. 69952
This item has been digitally signed and sealed by Allan G. Abubakar,
P.E. on the date adjacent to the seal. Printed copies of this
document are not considered signed and sealed and the signature
must be verified on any electronic copies.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1