HomeMy WebLinkAboutproject info ER6CEIVED21rmitting
I
i
i
t
r
� r BOX EAVE RAFTER END WALL AND SIDE WALL OPENINGS
SEE NOTES
^�z z✓ y SEE NOTES
'SHEET 3)
l2 FOR 14AXIMUM 4 CSHEET 3)
Y % SPACING 12 FOR MAXIMUM
SPACING
--------------
4.
F
6 7 I
� a 12 l2
7
6
12 12
}� OPENING FOR 3
-� ROLL-UP
DOOR WITH HEADER
" (SEE SHEET 16) OPENING F62
r: PERSONNEL DOOR `•
6. g WITH HEADER # -
,. 12 5 1311
i
y.
TYPICAL BOX EAVE RAFTER TYPICAL BOX EAVE RAFTER END
1 END WALL FRAMING SECTION WALL OPENINGS FRAMING SECTION
SCALEi NTS SCALES NTS
I
i
SEE NOTES(SHEET 3) BOX EAVE RAFTER/COLUMN
FOR MAXIMUM ASSEMBLY
SPACING
REC�JVED I
OCT I
3 2021
6A e 12 9 _ ST. Lucie Coun o ;(
t2 12 Syr Permitting 'f
i.l
12 1a 1e
OPENING FOR ttt
ROLL-UP
OR WITH HEADER OPENING FOR WINDOW
NG FOR
(SEE SHEET 16) PERRSONNEL DOOR WITH HEADER AND
ViTH HEADER WINDOW RAIL'ALSO-
APPLWABLE TO END _
13 14 2 14 WALLS)
l3 13 12 -I
TYPICAL BOX EAVE RAFTER SIDE
WALL OPENINGS FRAMING SECTION , ��NE�SSCALM�i!��P'� .• . O ii
.`� �•'��,�G E NSF''
No 57170 ;
�.'� STATE OF -'ZU
41
%`%
This Item has been electronically signed and (
sealed by Wayne S.Moore,PE. 5
using a Digital Signature and date.
Printed copies of this document are not
2
considered signed and sealed and the
signature must be verified on any electronic
copies.
TUBULAR BUILDING SYSTEMS
MOORE AND ASSOCIATES 1
DRAWN Bri JG 631 SE INDUSTRIAL CIRCLE II
ENGINEERING AND CONSULTING, INC. CHECKED BY1 PIN 30'-a":'0 0 ENCLOSED BUILDING EXP.B
LAKE
�I
THIS DOCIJME,NT IS DE PRWMTY W MCW AND ASSOCIATES EtfGOMMMG AHII JOB NM x0mv 3
CONSULTING TIE UNAURRRIIED REPRODUCTIQf,CQPYDIO,0!OTHERWISE USE w PRDJECT MGM WSN DATEI 1-8-PA SCALEt NTt 1 3005/C0332S
THE DOCIRENT ML STR1ZLT PROHIBITED AND ANY DFRI'WofT THfIMiJ"MAY �!
SUOECT CLIENT. TBs ISHT, 10 DW11 NO SK-3 REV., S
I
l