Loading...
HomeMy WebLinkAboutproject info ER6CEIVED21rmitting I i i t r � r BOX EAVE RAFTER END WALL AND SIDE WALL OPENINGS SEE NOTES ^�z z✓ y SEE NOTES 'SHEET 3) l2 FOR 14AXIMUM 4 CSHEET 3) Y % SPACING 12 FOR MAXIMUM SPACING -------------- 4. F 6 7 I � a 12 l2 7 6 12 12 }� OPENING FOR 3 -� ROLL-UP DOOR WITH HEADER " (SEE SHEET 16) OPENING F62 r: PERSONNEL DOOR `• 6. g WITH HEADER # - ,. 12 5 1311 i y. TYPICAL BOX EAVE RAFTER TYPICAL BOX EAVE RAFTER END 1 END WALL FRAMING SECTION WALL OPENINGS FRAMING SECTION SCALEi NTS SCALES NTS I i SEE NOTES(SHEET 3) BOX EAVE RAFTER/COLUMN FOR MAXIMUM ASSEMBLY SPACING REC�JVED I OCT I 3 2021 6A e 12 9 _ ST. Lucie Coun o ;( t2 12 Syr Permitting 'f i.l 12 1a 1e OPENING FOR ttt ROLL-UP OR WITH HEADER OPENING FOR WINDOW NG FOR (SEE SHEET 16) PERRSONNEL DOOR WITH HEADER AND ViTH HEADER WINDOW RAIL'ALSO- APPLWABLE TO END _ 13 14 2 14 WALLS) l3 13 12 -I TYPICAL BOX EAVE RAFTER SIDE WALL OPENINGS FRAMING SECTION , ��NE�SSCALM�i!��P'� .• . O ii .`� �•'��,�G E NSF'' No 57170 ; �.'� STATE OF -'ZU 41 %`% This Item has been electronically signed and ( sealed by Wayne S.Moore,PE. 5 using a Digital Signature and date. Printed copies of this document are not 2 considered signed and sealed and the signature must be verified on any electronic copies. TUBULAR BUILDING SYSTEMS MOORE AND ASSOCIATES 1 DRAWN Bri JG 631 SE INDUSTRIAL CIRCLE II ENGINEERING AND CONSULTING, INC. CHECKED BY1 PIN 30'-a":'0 0 ENCLOSED BUILDING EXP.B LAKE �I THIS DOCIJME,NT IS DE PRWMTY W MCW AND ASSOCIATES EtfGOMMMG AHII JOB NM x0mv 3 CONSULTING TIE UNAURRRIIED REPRODUCTIQf,CQPYDIO,0!OTHERWISE USE w PRDJECT MGM WSN DATEI 1-8-PA SCALEt NTt 1 3005/C0332S THE DOCIRENT ML STR1ZLT PROHIBITED AND ANY DFRI'WofT THfIMiJ"MAY �! SUOECT CLIENT. TBs ISHT, 10 DW11 NO SK-3 REV., S I l