Loading...
HomeMy WebLinkAboutCreekside_Lot 106_Strapping.pdf®UNIVERSAL® ENGINEERING SCIENCES INSPECTION RESULTS Z'l l o 62 Inspection Date: U Permit No. a{ C 5 — O O ([J 7 Project: YX j Address: 9/3-Uk 41 �i ` )-" Check one: 1� Regular Inspection: '❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock I Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code:l J l Inspection ResultsP-Approved ❑ AE-Approved ith Exceptions ❑ DA-Disallowed ❑ Not Ready Conditions/Comments-. G4S 1. 2. 3. 4. 5. 6. 7. Inspector's Nam Lic.#: �J Z OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com