Loading...
HomeMy WebLinkAboutCreekside_Lot 19_ Bond Beam.pdflot /T ®UNIVERSAL" ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: O Permit No. /� Project: ry,n.e c 5•i,&./ Address: 9 / -7 �Q ✓6 Q r:= Check one: f Regular Inspection: ❑ Reinspection Date of Initial Inspection: lV Inspection Type Requested (check): �71 BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: a� Inspection Results: AP -Approved ElAE-Approved with Exceptions [IDA-Disallowed DP -Disapproved ❑ Not Ready Conditions/Comments: i" G 3 1. 2. 3. 4. 5. 6. 7. Inspector's Name://s�� Lic.#: BN55ar %% f OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com