HomeMy WebLinkAboutCreekside_Lot 113_Driveway Bldg.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: - / 3 ' I Permit No. g 7
Project: f�
Address:
Check one:
XRegular Inspection:
❑ Reinspection Date of Initial Inspection: / O - / -� -
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
I
I Service/Ground
I
Storm Piping & Test
I Insulation
Sheet Rock
Appliance/Equipment
I Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results:-VAP-Approved ❑ AE-Approved it Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: CS
1.
2.
3.
4.
5.
6.
7.
5 Inspector's Name: � Lic.#: A >
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com