HomeMy WebLinkAboutCreekside_Lot 76_Frame All.pdf®UNIVERSAL
ENGINEERING SCIENCES
Inspectii
Project:
Address,
Check one:
iV Regular Inspection:
INSPECTION RESULTS
Permit No.
/v V- /ra
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
I Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final ElectricaF
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions
r ( XDP-Disapproved ❑ Not Ready
Conditions/Comments: /UO
1.
2.
3.
4.
5.
6
h A,. s
r
❑ DA-Disallowed
7. 01 t t
Inspector's Name: Lic.#: lilt -2-2 S
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com