Loading...
HomeMy WebLinkAboutScan_2021-10-01-090849504 ST. LUCI E WORKS Section D(Steep Slope Roof System) Roof System Manufacturer: 132 Notice of Acceptance Number: �FL 13 Minimum Design Wind Pr ss res,If Applicca le(From RAS127 or calculations): Zone 1: s �one 2e:�one 2n one 2r Zone 3e. Zone 3r:" Deck Type: X Type Underfayment: C� Roo lope: ' 12 Insulation: Fire Barrier: Ridge Me 'ation? Fastener Type&Spacing: Adhesive Type: Type Cap Sheet: �0 r� tu 9"Q Mean Roof Height: Roof Covering: Type&Size Drip J Edge: ST. LUCIE WORKS Section A(General Information) Master Permit No. Process No. Contractors Name- w ur , ) - - License# �✓ L Job Address [�i 1' KJ/ `��� �1�d1 )a✓ (�/ �� .J �S , ROOF CATEGORY ❑Low Slope ❑Mechanically Fastened Tile 11140 ortar/Adhesive Set Tiles ❑Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance Ey<eroofing ❑Recovering .ROOF SYSTEM INFORMATION Low Slope Roof Area(SF) Steep Sloped Roof Area(SF) 2 Total(SF) Section B(Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets. 26 39 1 I S N �g I 'Q <0 1� e E co 9 e 03 CD N( N 31 39 th ST. LUCIE WORKS Section E(Tile Calculations) For Moment based tile systems,choose either Method 1 or 2.Compare the values for Mr with the values from Mf.If the Mf values are greater than or equal to the Mrvalues,for each area of the roof,then the the attachment method is acceptable. Method�1'Moment Based Tile Calculations Per RAS 12T (Zone 1: S"`�t,x a, Mg -Mdl Product Approval Mom_ (Zone 2e: S x •�� 1 -Mg �3 =M,� Product Approval Mf // (Zone 2n: ` x 1�° - -Mg: Mom, Product Approval Mf - (Zone 2r: x)6 -Mg:-?-_�N=M. Product Approval Mf G (Zone 3e: ��t 1 x� `S=23�"Mg:�' 1=Mr�� Product Approval Mf�- (Zone 3r• X -A-2 Mg: M�2� Product Approval Mf So' Method 2"Simplified Tile Calculations Per Table Below" Required Moment of Resistance NO From Table Below Product Approval Mf Mr required Moment Resistance* Mean Roof Height Roof Slope 15, 20' 25' 30' 40' 2:12. 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment based tile systems •For Uplift based tile systems use Method 3.Compare the values for F'with the values for Fr If the F'values are greater than or equal to the Fr values,for each area of the roof,then the tile attachment method is acceptable. Method 3"Uplift Based Tile Calculations Per RAS 12T (Zone 1: x L =x W:=____)-W: cos r =Fri Product Approval F' (Zone 2e: x L =x W:= )-W: cos r =Fr2e Product Approval F' (Zone 2n: x L =x W:= )-W: cos r =Fr2n Product Approval F' (Zone 2r: x L =x W:=_,-W: cos r =Frzr Product Approval F' (Zone 3e: x L =x W:=_)-W: cos r =Fr3e Product Approval F' (Zone 3r: x L =x W:= )-W: cos r =Fr3r Product Approval F' Where to Obtain Information Description Symbol Where to find From applicable table in RAS 127 or by an engineering analysis Design Pressure Zones 1,2e,2n,2r,3e,3r prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope 6 Job Site Aerodynamic Multiplier a Product Approval Restoring Moment due to Gravity Mg Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Mg Calculated Minimum Attachment Resistance F Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L=length W=width Product Approval All calculations must be submitted to the building official at the time of permit application.