Loading...
HomeMy WebLinkAboutRevisionsOFFICE USE ONLY: DATE FILED: REVISION FEE: LOCATION/SITE ADDRESS: PERMIT # J Q 7— 6 U4 6 RECEIPT # PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982.5652 (772) 462.1553 APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION DETAILED DESCRIPTION OF PROJECT CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: �/-43 C 04 BUSINESS NAME: N( QUALIFIERS NAME: J o RV ADDRESS: CITY: 1Z STATE: PHONE (DAYTIME): - O OWNER/BUILDER INFORMATION: NAME: ADDRESS: ST. LUCIE CO CERT. #: 16222 ZIP: FAX: % 9 CITY: STATE: ZIP: PHONE (DAYTIME: FAX: ARCHITECT/ENGINEER INFORMATION: NAME: ADDRESS: e CITY: STATE: ZIP: PHONE (DAYTIME): FAX: SLCCC.- 9123109 Revised 06130117 q�: ©0q D FORM R405-2020 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: ADDEO RESIDENCE Builder Name: Street: 12769 N.W. MARINER COURT Permit Office: City, State, Zip: PALM CITY, FL, 34990 Permit Number: Owner: LOUIS & GERALDINE ADDER Jurisdiction: Design Location: FL, Fort Pierce County: St. Lucie(Florida Climate Zone 2) 1. New construction or existing New (From Plans) 10. Wall Types(3790.0 sgft.) Insulation Area 2. Single family or multiple family Detached a. Concrete Block - Int Insul, ExteriorR=4.1 3590.00 ft2 b. Interior Frame -Wood, Interior R=11.0 200.00 ft2 3. Number of units, if multiple family 1 c. N/A ' R= ft2 4. Number of Bedrooms 3 d. NIA R= fP 5. Is this a worst case? No 11. Ceiling Types(3328.0 sqft.) Insulation Area a. Roof Deck (Unvented) R=20.0 3328.00 ft2 6. Conditioned floor area above.rade.(ft� 3328 grade,(" b. N/A R=, fie Conditioned floor area below grade (ft� 0 c. N/A R= ft2 7. Windows(608.0 sgft.) Description Area 12. Ducts, location & insulation level R ft2 a. U-Factor: Sgl, U=0.65 608.00 1`12 a. a. Sup: Attic, Ret: Attic, AH: ZONE 1 6 332.8 SHGC: SHGC=0.25 b. b. Sup: Attic, Ret:.Attic, AH: ZONE 2 6 332.8 b. U-Factor. NIA ft2 C. SHGC: 13. Cooling Systems kBtu/hr Efficiency c. U-Factor: N/A ft2 a. Central Unit 42.0 SEER:16.00 SHGC: b, Central Unit 42.0 SEER:16.00 Area Weighted Average Overhang Depth: 8.250 ft Area Weighted Average SHGC: 0.260 14. Heating Systems kBtu/hr Efficiency 8. Skylights Description Area a. Electric Strip Heat 29.0 COP:1.00 U-Factor:(AVG) N/A' NIA ft2 b. Electric Strip Heat 29.0 COP:1.00 SHGC(AVG): N/A 15. Hot Water Systems 9. Floor Types Insulation Area a. Natural GasTankless Cap: 1 gallons a. Slab -On -Grade Edge Insulation R= 0.0 3328.00 ft2 EF: 0.590 b. N/A R= if b. Conservation features c. N/A R= ft2 None 16. Credits None Glass/Floor Area: 0.183 Total Proposed Modified Loads: 100.09 PASS Total Baseline Loads: 102.88 i hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Review of the plans and specifications covered by this 01; .fgE ST Code. calculation indicates compliance TI) with the Florida Energy Code. PREPARED BY: 'a _ I Before construction is completed this building will be inspected for DATE: compliance with Section 553.908 o 'n,compliance Florida Statutes. r�'coD I hereby certify that this building, as desi ed, is with the Florida Energy Co e. wr OWNER/AGENT: BUILDING OFFICIAL: DATE: i DATE: - Compliance requires ce�hficati n by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accor#ance with R403.3.2.1. - Compliance with a proposed fduct leakage On requires a PERFORMANCE Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with ANSIIRESNET/ICC 380, is not greater than 0.000 On for whole house. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires a PERFORMANCE envelope leakage test report with envelope leakage no greater than 4.33 ACH60 (R402.4.1.2). 8/17/2021 9:26:02 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 FIDE COPY 2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR -BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: ADDEO RESIDENCE Builder Name: Street: 12769 N.W. MARINER COURT Permit Office: City, State, Zip: PALM CITY, FL, 34990 Permit Number: Y Owner: LOUIS & GERALDINE ADDEO Jurisdiction: U Design Location: FL, Fort Pierce County: St. Lucie(Flodda Climate Zone 2) v COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit Ceiling/attic the Insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity with sealed. a material having a thermal resistance of R-3 per Knee walls shall be sealed. inch minimum Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/door jambs and framing, and and doors sk li hts and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge. of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered Where provided instead of floor insulation, insulation with a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawls ace. walls Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Narrow cavities Batts In narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Recessed lighting Recessed light fixtures installed in the building thermal Recessed light fixtures installed in the building envelope shall be seated to the finished surface. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Showar/tub The air barrier installed at exterior walls adjacent to showers Exterior walls adjacent to showers and tubs shall on exterior wall and tubs shall separate them from the showers and tubs. be insulated. Electricallphone boN The air barrier shall be installed behind electrical or on exterior walls communication boxes or air -sealed boxes shall be installed. HVAC register booti HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or ceiling penetrated by the boot. Concealed When required to be sealed, concealed fire sprinklers shall only sprinklers be sealed in a manner that is recommended by the manufacturer, Caulking or other adhesive sealants shall not be used to fill voids J voids between fire sprinkler cover plates and walls or callings. a. In addition, inspection of log walls shall be in accordance with the provisions of [CC-400. 8/17/2021 9:26:42 AM EnergyGaugeO USA 7.0 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1