Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRevisionsOFFICE USE ONLY:
DATE FILED:
REVISION FEE:
LOCATION/SITE
ADDRESS:
PERMIT # J Q 7— 6 U4 6
RECEIPT #
PLANNING & DEVELOPMENT SERVICES
BUILDING & CODE REGULATION DIVISION
2300 VIRGINIA AVENUE
FORT PIERCE, FL 34982.5652
(772) 462.1553
APPLICATION FOR BUILDING PERMIT REVISIONS
PROJECT INFORMATION
DETAILED DESCRIPTION OF PROJECT
CONTRACTOR INFORMATION:
STATE of FL REG./CERT. #: �/-43 C 04
BUSINESS NAME: N(
QUALIFIERS NAME: J o RV
ADDRESS:
CITY: 1Z STATE:
PHONE (DAYTIME): - O
OWNER/BUILDER INFORMATION:
NAME:
ADDRESS:
ST. LUCIE CO CERT. #: 16222
ZIP:
FAX: % 9
CITY: STATE: ZIP:
PHONE (DAYTIME: FAX:
ARCHITECT/ENGINEER INFORMATION:
NAME:
ADDRESS: e
CITY: STATE: ZIP:
PHONE (DAYTIME): FAX:
SLCCC.- 9123109
Revised 06130117
q�:
©0q D
FORM R405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: ADDEO RESIDENCE
Builder Name:
Street: 12769 N.W. MARINER COURT
Permit Office:
City, State, Zip: PALM CITY, FL, 34990
Permit Number:
Owner: LOUIS & GERALDINE ADDER
Jurisdiction:
Design Location: FL, Fort Pierce
County: St. Lucie(Florida Climate Zone 2)
1. New construction or existing New (From Plans)
10. Wall Types(3790.0 sgft.)
Insulation Area
2. Single family or multiple family Detached
a. Concrete Block - Int Insul, ExteriorR=4.1 3590.00 ft2
b. Interior Frame -Wood, Interior R=11.0 200.00 ft2
3. Number of units, if multiple family 1
c. N/A '
R= ft2
4. Number of Bedrooms 3
d. NIA
R= fP
5. Is this a worst case? No
11. Ceiling Types(3328.0 sqft.)
Insulation Area
a. Roof Deck (Unvented)
R=20.0 3328.00 ft2
6. Conditioned floor area above.rade.(ft� 3328
grade,("
b. N/A
R=, fie
Conditioned floor area below grade (ft� 0
c. N/A
R= ft2
7. Windows(608.0 sgft.) Description Area
12. Ducts, location & insulation level R ft2
a. U-Factor: Sgl, U=0.65 608.00 1`12
a. a. Sup: Attic, Ret: Attic, AH: ZONE 1 6 332.8
SHGC: SHGC=0.25
b. b. Sup: Attic, Ret:.Attic, AH:
ZONE 2 6 332.8
b. U-Factor. NIA ft2
C.
SHGC:
13. Cooling Systems
kBtu/hr Efficiency
c. U-Factor: N/A ft2
a. Central Unit
42.0 SEER:16.00
SHGC:
b, Central Unit
42.0 SEER:16.00
Area Weighted Average Overhang Depth: 8.250 ft
Area Weighted Average SHGC: 0.260
14. Heating Systems
kBtu/hr Efficiency
8. Skylights Description Area
a. Electric Strip Heat
29.0 COP:1.00
U-Factor:(AVG) N/A' NIA ft2
b. Electric Strip Heat
29.0 COP:1.00
SHGC(AVG): N/A
15. Hot Water Systems
9. Floor Types Insulation Area
a. Natural GasTankless
Cap: 1 gallons
a. Slab -On -Grade Edge Insulation R= 0.0 3328.00 ft2
EF: 0.590
b. N/A R= if
b. Conservation features
c. N/A R= ft2
None
16. Credits
None
Glass/Floor Area: 0.183 Total Proposed Modified Loads: 100.09
PASS
Total Baseline
Loads: 102.88
i hereby certify that the plans and specifications covered by
this calculation are in compliance with the Florida Energy
Review of the plans and
specifications covered by this
01; .fgE ST
Code.
calculation indicates compliance
TI)
with the Florida Energy Code.
PREPARED BY: 'a _
I
Before construction is completed
this building will be inspected for
DATE:
compliance with Section 553.908
o
'n,compliance
Florida Statutes.
r�'coD
I hereby certify that this building, as desi ed, is
with the Florida Energy Co e.
wr
OWNER/AGENT:
BUILDING OFFICIAL:
DATE: i
DATE:
- Compliance requires ce�hficati n by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accor#ance with R403.3.2.1.
- Compliance with a proposed
fduct leakage On requires a PERFORMANCE Duct Leakage Test Report confirming duct
leakage to outdoors, tested in accordance with ANSIIRESNET/ICC 380, is not greater than 0.000 On for whole house.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project
requires a PERFORMANCE envelope leakage test report with envelope leakage no greater than 4.33 ACH60 (R402.4.1.2).
8/17/2021 9:26:02 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1
FIDE COPY
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR -BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: ADDEO RESIDENCE Builder Name:
Street: 12769 N.W. MARINER COURT Permit Office:
City, State, Zip: PALM CITY, FL, 34990 Permit Number: Y
Owner: LOUIS & GERALDINE ADDEO Jurisdiction: U
Design Location: FL, Fort Pierce County: St. Lucie(Flodda Climate Zone 2) v
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
Ceiling/attic
the Insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity with
sealed.
a material having a thermal resistance of R-3 per
Knee walls shall be sealed.
inch minimum
Exterior thermal envelope insulation for framed walls
shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/door jambs and framing, and
and doors
sk li hts and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge. of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered
Where provided instead of floor insulation, insulation
with a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawls ace. walls
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Narrow cavities
Batts In narrow cavities shall be cut to fit, or narrow
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and
conditioned spaces.
Recessed lighting
Recessed light fixtures installed in the building thermal
Recessed light fixtures installed in the building
envelope shall be seated to the finished surface.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind piping and wiring.
Showar/tub
The air barrier installed at exterior walls adjacent to showers
Exterior walls adjacent to showers and tubs shall
on exterior wall
and tubs shall separate them from the showers and tubs.
be insulated.
Electricallphone boN
The air barrier shall be installed behind electrical or
on exterior walls
communication boxes or air -sealed boxes shall be installed.
HVAC register booti
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering
or ceiling penetrated by the boot.
Concealed
When required to be sealed, concealed fire sprinklers shall only
sprinklers
be sealed in a manner that is recommended by the manufacturer,
Caulking or other adhesive sealants shall not be used to fill voids
J
voids between fire sprinkler cover plates and walls or callings.
a. In addition, inspection of log walls shall be in accordance with the provisions of [CC-400.
8/17/2021 9:26:42 AM EnergyGaugeO USA 7.0 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1