Loading...
HomeMy WebLinkAboutCreekside_Lot 110_Dry In Tin Tab.pdfg]UNIVERSAL® ENGINEERING SCIENCES INSPECTION RESULTS 14// V Inspection Date: Permit No. 1 C) 3 Project: � j Address: / yV � — � c�1� I CChek ck one: Regular Inspection:❑ Reinspection Date of Initial Inspection: Incnartinn Tvne Reauested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: aL Inspection Results: AP -Approved ❑ AE- proved with Exceptions ❑ DA-Disallowed 6DP-Disapproved ❑ Not Ready Conditions/Comments: Ira 1. <. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: d91V 7-;� � ti OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com