HomeMy WebLinkAboutCreekside_Lot 126_Eufer.pdf®UNIVERSAL Z
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: C — Permit No. y /(/
Project:
Cx
Address:
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: L '� l
Inspection Results: LEAP -Approved ❑ AE-Approved with Exceptions ElDA-Disallowed
Ll{ `DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
n
5.
F
7.
Inspector's Name:
V17
Lic.#: 01V %% ,S 2-
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com