HomeMy WebLinkAboutCreekside_Lot 31_Column.pdfUdENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: b_ o / Permit No.
Project: C o, D 4 4/
Address: 3�/ o i Ll f ✓
Check one:
Regular inspection: L, 7
/❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results -Approved ❑ AE-Approved with Exceptions
-Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
S.
6.
7.
Inspector's Name:
Lic.#: )3V Z
OFFICES THROUGHOUT FLORIDA
❑ DA-Disallowed
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com