Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TDH Calculator
> / PENTAIR STEP 1 POOL SPECIFICATIONS STEP 3 OF 3: TDH CALCULATION Pool. Specifications TDH CALCULATOR STEP 2 SELECT EQUIPMENT Pool Volume (gallons): 9975.00 gallons Suction Lift: 1.50 ft Turn Over (hours): 6.00 hours Filtration Flow Rate: 36.00 GPM Maximum Flow Rate 70.97 GPM Selected Components Components . . (,SELECTION QUANTITY J MAXIMUM PIPE VELOCITY (FT/SEC) SUCTION OUTLET 8 (CONSULT YOUR LocaLcooEl - T---_ - - - DISCHARGE 8 fair ICHLOR 30TOTAL PIPING LENGTHS (FT) INLET 40.00 } DISCHARGE 48.00 SELECTION QUANTITY f 2" X 2.5" 3 WAY VALVE 5 !-- = — ---—------- --I 90 DEGREE ELBOW INLET 18 ,J& DISCHARGE 10 MAIN DRAIN { TEE BRANCH INLET {ImullnnU� n.. DISCHARGE 0 I CLEAN AND CLEAR RP TEE THROUGH INLET 0 1 ( ( DISCHARGE 2 ULTRATEMP I ®� 1 INCH RETURN 3 1 NO IMAGE �- AVAILABLE ----- - SELECTION / MODEL QUANTITY `Vic, La SUPERFLO VS I Results: Your TDH"Calcutation Flow Rate 70.97 GAL/MIN Max Flow Rate at Max RPM: 70.97 GAL/M I N Head Loss 50.17 FT Head Loss at Max Flow Rate at Max 50.17 FT RPM: REQUIRED MINIMUM PIPE SIZE Inlet Piping: 2.00 Discharge Piping: 2.00 PUMP RPM Flow Rate at Selected Pump RPM: 70.97 Pump RPM: 3450 Head Loss at Selected Pump RPM: 50.17 SYSTEM HEAD PRESSURE CURVE BY PUMP SELECTION 90 80 70 T N 60 � - - --- --- --- - - - - ---- -- -' - -- -------- — -- -- - -- - - -' - ---- - - - - - --- -- - - y U 50 _ __ R 3 fD 0 40 0 cz- o y 30 - --- -------'-------- —-----'--- ----------------- -- 2 z' 20 0 10 -- --- - - — - - --- - - 0 0 10 20 30 40 50 60 70 80 90 100 Volumetric Flow Rate (GPM) —Clean System Curve —Pump Curve ■ Desired Operation Point -Clean System s Pump Operation Point BACK