Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT Planning&Development Services Building&Code Regulation Division e 2300 Virginia Ave • Fort Pierce,FL 34982 772-462-2172 Fax772-462-6"3 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERM�#:�_b Y -' ®���f OB DDR SS: �� Z lx��-e. BUILDER/CONTRACTOR: Ui PEST CONTROL CONTRACTOR: e5 PEST CONTROL LICENSE #: �LiS 13 1 We, the undersigned, hereby certify that we have pretreated the above described construction for _ subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 9D Chemicals used: C�rOSSc� Percentage of solution: ' S Total gallons used: Date of Treatment: F Time of Treatmen Footing Slab 1st Treatment 1�Treatment Re-Treat Re-Treat Driveway Pools 1st.Treatment 1st Treatment Re-Treat Re-Treat Other Perimet Final Inspection 1s,Treatment Re-Treat !S Z/ Signa re of Exterminator e Note: There must be a completed form for each required tr iment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection fee charged, FBC104.2.6 Certificate ofprotedive Treatment for prevention oftenn&es A weather resistantiobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatmen4 site location,area bested, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final extenor teatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014