Loading...
HomeMy WebLinkAbout201 TRUSS PLAN(1)10 1 7 10 71011 .1 1 In IM IN 1� AT- 1� 1� 1� 1� 1� 1� 1� 1� 1� 1� 1� 1� A� 1� 1� 1� 1� IN 71 011 In I co I -r-- INI JJ --]I- N U) J N J J N JJ J �o N JJ J INI JJ J �o JJ J koFib] N JJ J N JJ J kb- N JJ J ibi N JJ J N JJ J IN JJ J NiN JJ J JJ J F� N JJ J N JJ J N JJ J N JJ J N JJ J %D N JJ �o N J J N JJ J J �o N JJ ANOL- FLAT CLNG 7 7 11Z FLAT CLNG N J N N N J J IFFI-, JFJ IFFI- N N J N NN N N N N J N J N N J J N N J J J N N J 1co lu-) � M U U m m m �LE LE LE m LE LE LE �LE m LE m m LE LE �LE m m LE LE Noqo ho m U U U 71 011 71011 .1 1 5 N FA 7 II 7 N 5 T' Hatch Legend 16' -0" A.FOF TRUSS END DETAIL IVA HANGER LEGEND * - ALL 2x HANGERS SHOWN ARE HTU26 UNLESS NOTED OTHERWISE * - ALL 4x2 FLOOR HANGERS SHOWN ARE HHUS46 UNLESS NOTED OTHERWISE MAIN WIND FORCE RESISTING SYSTEM/C-C HYBRID IMPORTANT WIND ASCE7-16 ENCLOSED This Drawing Must Be Approved And EXPOSURE CATEGORY B Returned Before Fabrication Will OCCUPANCY CATEGORY II Begin. For Your Protection Check All WIND LOAD 160 MPH Dimensions And Conditions Prior To *TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF Approval Of Plan. BOTTOM CHORD LIVE LOAD NONCONCURRENT WITH ANY OTHER LIVE LOADS SIGNATURE BELOW INDICATES ALL NOTES AND DIMENSIONS HAVE ROOF LOADING FLOOR LOADING BEEN ACCEPTED. TCLL: 30 PSF TCLL: PSF TCDL: 15 PSF TCDL: PSF BCDL: 10 PSF BCDL: PSF By Date TOTAL: 55 PSF TOTAL: PSF DURATION: 1.33 DURATION: CAUTION!!! DO NOT ATTEMPT TO ERECT TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND BSCI-131 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING TRUSSES. (ie. SHEATHING, SHINGLES, ETC.) ALL INTERIOR BEARING WALLS MUST BE IN PLACE PRIOR TO INSTALLING TRUSSES. REFER TO FINAL ENGINEERING SHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES AND NAILING SCHEDULE. 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNING Backcharges Will Not Be Accepted Regardless of Fault Without Prior Notification By Customer Within 48 Hours And Investigation By Builders FirstSource. NO EXCEPTIONS. The General Contractor Is Responsible For All Connections Other Than Truss to Truss, Gable Shear Wall, And Connections. Temporary and Permanent Bracing, And Ceiling And Roof Diaphragm Connections. BUILDER: BELA VISTA CONTRACT RES: N/A MODEL: ADDRESS: 601 NA NORHT 39TH ST LOT / BLOCK: -- CITY: FORT PIERCE COUNTY ST LUCIE CO DRAWN BY: JL JOB # : 2721317 DATE: 03/25/21 SCALE: NTS REVISIONS: 1. 2. 3. 4. kl! 01ders FirstSource 701 S. KINGS HIGHWAY FORT PIECE, FL 34945 Ph. (772) - 461 5475