HomeMy WebLinkAboutBoat Lift PlanENGINEERING REVIEW.
BOAT LIFT DRIVE UNITS AND SPECIFIED
MOUNTING HARDWARE COMPLY WITH
WIND LOAD REQUIREMENTS OF THE
7Thl EDITION. (2020) FLORIOA BUILC'"'^
CODE, PER ASCE 7-16, AND PER DE�
LOAD REQUIREMENTS OF THE 2
EDITION ALUMINUM ASSOCIATIO
ALUMINUM DESIGN MANU,
DRIVE UNITS, INSTALLED AS PER Hl—
INSTRUCTIONS, WILL EXCEED ULTIM
DESIGN WIND SPEED OF 200 A
(EXPOSURE CATEGORY C OR
BOATS ARE TO BE REMOVED FROM B
LIFTS PRIOR TO A MAJOR WIND EV
PILINGS.
PILING PENETRATION TO BE 10'
INTO THE SAND BOTTOM OR 5'
INTO ROCK STRATA, SUB —SURFACE
CONDITIONS CAN VARY GREATLY,
THE CONTRACTOR SHALL VERIFY
ALL PILE CAPACITIES TO COMPLY
WITH FBC 2020. ALL PILINGS TO
BE 10" MINIMUM
DIAMETER 2.5 C.C.A PRESSURE
TREATED WOOD, PRE —STRESSED
CONCRETE OR COMPARABLE
E Q U I V A L E N T.
ELECTRICAL REVIEW.
1-112 HP ELECTRIC MOTOR
-- AMPS @ 115V EACH
9.6 AMPS ® 230V EACH
QUANTITY 4
TOTAL WATTS: 8832
NOTE TO EXAMINER:
THIS CERTIFIED ENGINEERED
DRAWING HAS BEEN PREPARED
SPECIFICALLY FOR USE ONLY BY:
°pgO00000000Baaao°0o
m e oOOOo
E IV
O
4. NO.4.3855 �
OIV)
o VDMAR292
oq �o
0o O STATE OFAN
oo°
ORI
o°OOOOss u ON Ao aoop°o°o ° o
ROGER BABER
P.E. NO. 43855
MCR PROFESSIONAL ENGINEERING
2430 NE DIXIE HWY
JENSEN BEACH, FL 34957
PILING MOUNTING
MINIMUM (2) 3/4" DIA. SS THRU
BOLTS FOR WOOD AND CONCRETE
PILINGS REQUIRED PER PILING TO
SECURE DRIVE UNITS PER FBC 2020.
70 PVC. GUIDE POLES 4 c-
9 GUIDE P BRACKETS 4 V
B BUNK BR —IS W HARDWARE 4 16, 000 LB. T2 TOPLESS X2 . %��/� YLOC BOA TLIFTS 'AND MARINE PRODUCTS
7 ALUMINUM BUNKS OR CARPEfEO WCOD BUNKS 2 /UnU/
B UFIER BEAM ASSEMBLY 2 0 405„0, SEL VITZ ROAD
5 4'ALUM/NUM,-,AC * BOAT LIFT (2020 FBC)
B s x so ssac rYP£ w� ° FORT PIERCE, FL 34981
a ,
2 7-12UPSSN07fX7 . 1-800-544-0735 www.hi—tide.com
1 GEAR DRIVE GEAR Box + R. HYDE SCALE: NTS DATE.• 114121 REV.• 1
DESCRIPTION OT