Loading...
HomeMy WebLinkAboutBoat Lift PlanENGINEERING REVIEW. BOAT LIFT DRIVE UNITS AND SPECIFIED MOUNTING HARDWARE COMPLY WITH WIND LOAD REQUIREMENTS OF THE 7Thl EDITION. (2020) FLORIOA BUILC'"'^ CODE, PER ASCE 7-16, AND PER DE� LOAD REQUIREMENTS OF THE 2 EDITION ALUMINUM ASSOCIATIO ALUMINUM DESIGN MANU, DRIVE UNITS, INSTALLED AS PER Hl— INSTRUCTIONS, WILL EXCEED ULTIM DESIGN WIND SPEED OF 200 A (EXPOSURE CATEGORY C OR BOATS ARE TO BE REMOVED FROM B LIFTS PRIOR TO A MAJOR WIND EV PILINGS. PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' INTO ROCK STRATA, SUB —SURFACE CONDITIONS CAN VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE CAPACITIES TO COMPLY WITH FBC 2020. ALL PILINGS TO BE 10" MINIMUM DIAMETER 2.5 C.C.A PRESSURE TREATED WOOD, PRE —STRESSED CONCRETE OR COMPARABLE E Q U I V A L E N T. ELECTRICAL REVIEW. 1-112 HP ELECTRIC MOTOR -- AMPS @ 115V EACH 9.6 AMPS ® 230V EACH QUANTITY 4 TOTAL WATTS: 8832 NOTE TO EXAMINER: THIS CERTIFIED ENGINEERED DRAWING HAS BEEN PREPARED SPECIFICALLY FOR USE ONLY BY: °pgO00000000Baaao°0o m e oOOOo E IV O 4. NO.4.3855 � OIV) o VDMAR292 oq �o 0o O STATE OFAN oo° ORI o°OOOOss u ON Ao aoop°o°o ° o ROGER BABER P.E. NO. 43855 MCR PROFESSIONAL ENGINEERING 2430 NE DIXIE HWY JENSEN BEACH, FL 34957 PILING MOUNTING MINIMUM (2) 3/4" DIA. SS THRU BOLTS FOR WOOD AND CONCRETE PILINGS REQUIRED PER PILING TO SECURE DRIVE UNITS PER FBC 2020. 70 PVC. GUIDE POLES 4 c- 9 GUIDE P BRACKETS 4 V B BUNK BR —IS W HARDWARE 4 16, 000 LB. T2 TOPLESS X2 . %��/� YLOC BOA TLIFTS 'AND MARINE PRODUCTS 7 ALUMINUM BUNKS OR CARPEfEO WCOD BUNKS 2 /UnU/ B UFIER BEAM ASSEMBLY 2 0 405„0, SEL VITZ ROAD 5 4'ALUM/NUM,-,AC * BOAT LIFT (2020 FBC) B s x so ssac rYP£ w� ° FORT PIERCE, FL 34981 a , 2 7-12UPSSN07fX7 . 1-800-544-0735 www.hi—tide.com 1 GEAR DRIVE GEAR Box + R. HYDE SCALE: NTS DATE.• 114121 REV.• 1 DESCRIPTION OT