Loading...
HomeMy WebLinkAboutBoat Lift PlanENGINEERING REVIEW. BOAT LIFT DRIVE UNITS AND SPECIFIED MOUNTING HARDWARE COMPLY WITH WIND LOAD REQUIREMENTS OF THE 7TH EDITION (2020) FLORIDA BUILC'"'^ CODE, PER ASCE 7-16, AND PER DE_` LOAD REQUIREMENTS OF THE 2 EDITION ALUMINUM ASSOCIATIO ALUMINUM DESIGN MANU, DRIVE UNITS, INSTALLED AS PER Hl- INSTRUCTIONS, WILL EXCEED ULTIM DESIGN WIND SPEED OF 200 A (EXPOSURE CATEGORY C OR BOATS ARE TO BE REMOVED FROM B LIFTS PRIOR TO A MAJOR WIND EV PILINGS: PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' INTO ROCK STRATA, SUB -SURFACE CONDITIONS CAN VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE CAPACITIES TO COMPLY WITH FBC 2020. ALL PILINGS TO BE 10" MINIMUM DIAMETER 2.5 C.C.A PRESSURE TREATED WOOD, PRE -STRESSED CONCRETE OR COMPARABLE E Q U I V A L E N T. ELECTRICAL REVIEW. 2 HP ELECTRIC MOTOR -- AMPS 0 115V EACH 12.4 AMPS @ 230V EACH QUANTITY- 4 TOTAL WATTS: 11408 ca �3 LG m v m co rTl c p LV r NOTE TO EXAMINER: THIS CERTIFIED ENGINEERED DRAWING HAS BEEN PREPARED SPECIFICALLY FOR USE ONLY BY.• oppppppppopppooBB000000 0000 m a ooOo o� G� \ CEly3�@°o 0o O e' NO.43855 /b\ P� VED MAR 2 9 2 21 � I STATE OF W e 00.1 A �o o°o° lCs 4 O R S O 0 000Oo 8 °pOo N Ap oa ROGER BABER P.E. NO. 43855 MCR PROFESSIONAL ENGINEERING 2430 NE DIXIE HWY JENSEN BEACH, FL 34957 PILING MOUNTING MINIMUM (2) 3/4" DIA. SS THRU BOLTS FOR WOOD AND CONCRETE PILINGS REQUIRED PER PILING TO SECURE DRIVE UNITS PER FBC 2020. TO PVC WIDE POLES 4 9 GUIDE P ACKE 4 B BUNK BRACKETS W HARDWARE ' 20, 000 LB. T2 TOPLESS X2 Io �o�L BOA RIFTS AND MARINE PRODUCTS 7 ALUM/NUN BUNKS CARPETED 1t000 BUNKS 2 B LIFTER BEAM ASSEMBLY 2 p 4056 SEL VI TZ ROAD 5 '4' ALUM/NUM SHEAVE 4 BOAT LIFT (2020 FBC) 4 .T X aO SSAC TYPE Ja4 4 FORT PIERCE, FL 34981 A-r'2 4 1-800-544-0735 www.hi-tide.com T GEAR ORlYE GEAR BOX 4 R. HYDE SCALE: NTS DATE.• 114121 REV. 1 BESCRIPTLON Gr