Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FSI Skirting Ventilation Specs
0 -' - U-P, *a EMS- aM� Mw..ae- r •-••."y •.raea�a.lna. Alftovo gupp #:So SkIrtfreg top r9ie Oesigre rO1, vent panels that 'ScId an adi f zO �.� pAtlanta sup0�l98I Fag IfontRation Per 81€lamI �+ gn py� y p��. p +- ��sc�hO411 Ce Typical W at 28' height 5lineal ?Set Top Rail vent: 16511n0al fM x 2,60 N. inches per foot 124 Pam. 28" vang panel: 124 pcs. x g.S eq. inche's per Total venblevon TQt!mt Vsnalabon aq. ft. f 1527,7 eq. InIchOs / 144 F I P Ai ArfACH BACK RAIL I. Determine a place for ono dm&'Flaw bomw edge of back,Tait justbdnwbwom edge of thehome.'1'ltiaiocatioa must Oft solid aupporc for %=cft and wind W p=uan fir ganelo and rails. I R:ep the bade mg straigbe sod level. Saap a ubaik Su+e around the homw to gatide the eep edge of the ba& rail- 3. Coruect =awing or nailing method for basis ul- Stanton ¢lee bask side of the home. Miom taws a ;db in the sang of die slot: Screwlna to CIIOW EX a clearance of 1/16° from dtc back A su&M 11M avoid tightly scat:+w 4 or adbng bads. ra A 1116" ci acaacce dIaM far nonce! QVw► ft and con"Mon with temper u= , k= a screw or nail in every Aar &t 4, pevvicle a M' ST betma each back rail uc&m for aormai dht rrttd apaaliom To Wtall Second corm; MAt to SMp 1 PAcaw Aa OffA.S IL MB+ OR NOVO 1. j at,ragoa vo lint• pua d montale. Coloque d bordc kfidor del Ad de arroyo pur++to alrsio del horh infetiot de la CM PM ubleaddn deb.- nine= un apayo 6rnne q" PdMIM &M % Helm yv wpm me is pra96a por cargos d- vicato ett lay p Rdes. 2. M opt+ p Macho d rid do sopom y a aiva ltrIatque uctn tine& wn el eotdel catimdo dmjedor de la case pm guiac el bride supwor del Ad da qwp 3. M&o& con, w pars clavar d rd de spoyo: Comience an In poste Hof d.- la cam. Coi*qn9 100 claveS eta d =tw da Is wsa pare davw.Introdum los c yd* una holpm cle 1fll6a du& la supergde der rigs de Vqm Now No cIM MIY OWdammm et del de apoyo. Una hol m da V16" eon Ia cd x= dcl CIM p=idxd el mpado wfid w pm mbar la a paoWn y ==cads nonnd a mdmaw de Ion earabaoc de tcmpetat=. Coles los dM en realm dwM 4. Y)qc tea apadu & IM cow c& wcddca de Ad do aptPM terser en eucnta la apami8n tdrmkz am al. Para instalat d prodsrcttr andcdog dt: ba.-aqui 04 oansuko d PM 1. STEP Be MOUW BaTTOM RAIL L Gttutaa pt to faPM *4 ground so that is � atttooth, fil of loos.- dumpy dszds or protruding obsMIM Guard again uneven s.ttu.g of newly tucavated VMMd by mounting d bottom rA on booted V323) hrrober. 2. MA tie Scound 1aCOdOn (handy below the outside, bottom et of dce home- Use a kvd or phuab bob to doming thin IOCa6 at act cornea I Snap a cba Lne or stretch a nylon stemg b.-twcea gash comer gains &a bartom tail. 4. pbsition the botsM rail wA t6 back leg Mud tlw inside of t chalklice pedmam S. Drivogym%Sp'Um cM 19 inches %w acts ofholes are FwAi is the bottom rAT* arc k=ftd inside the C&ArA and on basis 1%. Gtoand s;ptices cony be driven in either hole at intervals 19 inches. 6. IosMllation On oonsirte. Usd a 3147 masontq nag. You may a MR a bole Ew a 3/16' =Ay ecww and phadc Mason (Na 6 ,,, rcet.,b are available at most bacdwam stores.) To i mtd around comer, refer to SMp E. aB� Bi mOKM9 DEL PUEL INFENOR 1. pmpmca6a del � o de Merl• l3cti;pnre el Ow da mwaa quc udfomte, do =as svdm; temonee ttl obr&doo qua sobx& del plea ftTep la insWadit cowa el aseatamlmw .no wig aapisos reeidaexcavadoo, moatando d ddidai9tan anaFig maser tratada (r s 2i- 2. 1. ubiss4M en el fto di=a'a =te abajo dd 1 i0ftot cmw& la cua, Uee un Orval o una plocuada date MIM cola ttbiculM en aada now, 3: Marque um lima M 01 soak Mfisb o coloTm ota M nrt6ta antra M& acpuna pars sdw d rid de apayo. 4. aenl�i�d�agayv o?nIe pnta dsrespaldo hacia eliatsri pradmetrn mucado ?or it !(nee & maa. 5. Ittttodt= Ina dmu V= ea td piss, a rids 19 pufPdas. - riel inferior It proporcionon dos conjuatos de agujems. PAW se etrcuentmq deotro del cared, en la pare de soporta. Los claws grutwo pars el piso se pueden clavar a trav6s de coquina de Jos agujeros a Una distancia de 19 pu%adas entte si. 6. Inatalacida en plats de concrete Use un claw de Ye pare mamposteda. Ad mismo se puede taladtar un agtr w pare un tozr�[o de 3/16° tipo Molly cost ends plasdca. (Los matcd&e de clavos y Its tonOw estin disponibles en Iz mayorla de in ferrctertae}. Para hrstalar el produdto alrededor do In esquinas, consulte el POP E. SWTp C: PANEL INSTALLATION 1. 13c&nigS Z4"may From the low=t coma of the home, measure from the ground up to 2- M above the bottom edge of the back EdL (If the temperature is below 4nwith frazetrgroand, meMe, to Y above the back read cdge.) Z. Measurements on sloftsmund should be taken every 16" (width of panel). ., 3. Cut rite bottom of each panel to angle with the gro md. Each an panel section shouldalisa 9b°to the bottom edge ofthe. home. Use aviation snips or a power saw (with a fine toothed saw blade tunmd backwards) for cuttiq 4. Punch lock tabs every 4° along the top and bottom edge of cut panel smcdons (or outside portion of each panel face for 13° V"Mcst). A. Malco (SL-8) Snap Lock Punch tool is recommended. Cowult your skirting supplier Moir obtaining this tool. Tabs tine to be positioned outward to catch on the hooked edge of the rails. 5. Interloek panels and inyett into the bottom rail. Begin with the fast pastel ingested into tits hnaom tail. Locktabs should snap parr ehc hooked edge of the bottom rail. Insert next,panelsecdon into " the immlock hooks along the vertical edge of the panels. Seat each panel securely into the bottom rail. Repeat interlaclong panels, forming about a 12-foot sectiotr. Resume panel cut and interlock methad. To install around corner, refer to Step L PASO C: varALAa6m iDE Los PANELES L Comeowdo a V do Is, esgW%inferior mb b* de la case, mida desdclasuperficledelpisohostel W' urribadelbordeirdedordel sW de apgm (Si la temperature amblente durance Ia instalacidn es inferior a los 40T y elpho estd congelado, mida hasty 3" arriba del borde del del de apop). Z. Las Madoca en plena core dentivel deben hacerse a coda 16' {ancho del panel}. 3. Corte la parte inferior de cada panel en angnlo sqn el desnivei del pin Cads seecidn da panel cortado debe eases a escuadrn (9(r) con el horde inferior de la on. Use tijeras de hopalateto o una sierra elfctrica (con una hoja de oorw de clients find ©olocada of revs} Pang comer IN paneles. 4� Perfana lea lengtietas de ciem cads 4" a to largo del borde superior e inferior delas seedomes de paneles cottados. Sencomienda el use de una punaonadora de mano Wo (SL-8) Snap Lock Amch. ComWte cart su pmaeedor de cmda WX COMO obmVX egg hetramienta. Lae leag etn dd= co6sm heels duern a fur de poder WF=har el borde de gmeho de log rielea R e V 5. l nganche los panelcs c intnoduzcalos en el riel inferior. Comience con el primer panel inuoducido ea el riel inferior. l as leng,etas de aerie deben engand =r, pasta mis 0 del borde con gancho del rieI de apoyu, Introduzca la slguientc secddn de panel en Ios ganchos de enchvamiento a to largo dal borde vertical de los paneles. Adana, cads panel firmemente err al riei inEerlor. Repiq eI endesamiento de los paneks hasty %nmar una secciGn de aproxlruadamento 12 piles. Reanude cl corte de los pancks y e1 Ineoodo de enclava Wento. Pala instalar el producoo en Lis esquinas, consulte el paso E. STEP D: INTERLOCK FRONT RAIL WITH BACK RAIL L Stair "yapping oa* ead of the hunt top tall into the back top rail, creating the interlock. Push the front top rail upward, its entire length until the front top rail is completely iaterlocked with the back rail. 2. Overlap V each top rail sector. To inated around comer, refer to Step E. PASO D: FNCLAVAMIEN'1'O DEL RIEL FRONTAL CON EL RIEL DE APOYO 1. Conknce engancbando un edzino del rut frontal superior en Cl ricl sapedor de apoy+v, Para format d tneM01sm0 de enchvamiento. Empuje d rid superior de apoyo haeia w1a en toda su loaotud hasta que el riel frontal superior este completamente eagattchado en d rid de apoyo. 2. Thalape V cada seccidn del del supedoL Para itwAar d producto art In aquinas, conaulte el Paso E. �P Ei CORNER INSi`AUATION 1. Top back rail — Make a 1" vertical slit from the tap, Top interlock hook should be completely cut tirrough. Notch 45'onbotmm eutvedleg. 2. Bottom xail — Notch the back portion with snips, as illustrated, Dead around a corner and attach to the ground. 3. p=b Cttt panel to proper height. l7ewaWne point of corner bend bend over it table edge, forming a uniform angle, 4. Top frorrtnn-14oteh at both the top and bottom books of the £mnt tail, w illustrated,'Bend around the comer and .fit ipto the interlock with the top back rail Rarer to Step D. FOUR PABAOTCHED TOP FRONT RAILS ARE INCLUDSD IN TRIM PAR. PA 0 : 10STALW N DEL PRODUCTO EN LAS ESQUINAS 1. Riel aupctior de apor — Hager un corte vertical de 1" dead" la parte superior. El gancho superior de elidavamiento debe cortarse completameute. Naga una muesca a 451 en la pats cwvada inferior. 2. Riet inferior — Corte la pord6n posterior una tijeras de hojalatero won se muestra en le ilastract6n. Ddblelo alrededor de una esgtuos y divelo aI piso. 3. Pattedes — Corte et panel ala altars sptopiada, Determine, el punto de doblers doble d panel sobrc d borde de una mesa, Para formar un Ingalo react 4. Rid Prontel supedor — Corte los gancbos superior a lafarior dd rid frontal, $egbn sa biretta an la fipm. Doble la pieza alrededot de Ia esquina y engdnchela ee el mdavamiento con d rld superior de apoyo. Consulte el paao D. IN EL CONJUNTO TRIM PAK $E INCLUYEN CUARO RIFLES SUPERIORES FRONTALEs YA CORTADOE. nera_.f i.AAA !MAMA r j nr 7 ^a In "n man r