Loading...
HomeMy WebLinkAboutReview Comments Date: 5/18/2017 To: Plan Revie"o St Lucie County Building Department Subject: Cover Letter Review Comments 1704-0266 This Cover Letter serves as a guideline to the requested Permit Condit llions,for project 1704-0266. The items are numbered and are in order as they were listed on the Review Comments,sheet. I hope that we can expedite these corrections and break ground as soon as possible • Energycalculation FORM R405 has been updated with correct'`information and will be p resubmitted entirely. • Gable End comment: • The house does not have a gable end. The front entry shows an open truss detail, the flat area of the wall section that is seen above the door is a fill in frame area above the roof line, and does not transfer to the interior space of the building. • Manual J Comment: HVAC design was completed by Engineer'of Record,Thomas E.Audit, P.E. • Florida Building Code 2014 . �M1401.3 Sizing: Heating and cooling equipment and ap pliances shall be sized in accordance with ACCA Manual S based on building loads calculated in accordance with ACCA Manual J r other APPROVED heating and cooking; m rnetho'dologies. • Product Approval Requests • All product approval request will be addressed and suibmitted on new Product Review Affidavit form, Signed and Sealed by EOR,Thomas E. Audit, P.E. • Flame Spread Index, please find notes in upper right corner clouded on FP J1 • Gypsum Board Materials,please find notes in upper right corner clouded on FP-1 • Climatic and Geographic Design Criteria, please find in Structural General Notes in upper right corner clouded on S-1 • Carbon Monoxide Alarm •. There is no need for Carbon Monoxide Alarms for this residence. R315.1 Carbon Monoxide Protection: Every Separate ,building or a n� addition to an existing building for which a permit for new construction is issued and having fossil=fuel burnm heater`or a Nance,a fire lace, an attached ara e, or of I er feature,fixture,or g pp p !; g _.... element that emits,carbon monoxide as byproduct„ofjcombustron{shall have an operational carbon monoxide alarm installed within 10 feet of each room used for sleeping purposes. • Please Revise Left Elevation Page • The left elevation is drawn in accordance with the floor plan. Please explain in detail what is not correct. • . Front Door • The front door is stated on the plan as a side hinged and it is a 306'8,which is larger than required minimum. I; • Interior Wall Detail, please find detail clouded on right hand side of FP-1 • Strapping Details, please see clouded on sheets S-2 and S-3 • Window and Door Flashing Details, please find on upper right corner on.sheet S-2 • Attic Access • There are no air handlers or equipment being installed in the attic space. 1 I • Manufacturers TrusOase yout and Shop Drawings will be submitted in duplicate. • Attic is Non-Vented, see note clouded on sheet S-3 �J • Soil Bearing Capacity, please find EOR,Thomas E.Audit, P.E. note on sheet, 71 • Engineers notes reflect,the stated soil capacity on the plan is a building design requirement, not actual site tested capacity. Soil must meet this minimum requirement for building. Foundations cannot be properly tested until site is cleared. Soil data will be submitted to building department prior to pouringof any foundations. i I Stewart Cooper,Managing Member CBC1260066 Cooper Enterprises 4.0, LLC i 352-745-1916 stewart@cooperentllc.construction i ' I I II i 1 i z