HomeMy WebLinkAboutCreekside Lot 8, Code 139.pdf@UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
InspectionDate:G'
_ Il C> — a ' a Permit No. /
/
Project: ( /1_Y�Y.'lAAi 002 — }—
Address: 3 3 9—
Check one:
Regular Inspection:
!!!❑��` Reinspection Date of Initial Inspection: a a /
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
I PLUMBING
Underground
Underground
h-InSlab
Floor Rough -In
Rough -In
ing & Test
Masonry
Wall Rough -In
Stack Piping & Test
PMECHANICALICALFooting
& Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Testng
& Test
Framing
Panel/Feeder
Gas Piping & Testing
& Test
Structural
Service/Ground
Storm Piping & Test
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
JFinal
Re -inspection
Re -inspection
Final Building
Final Electrical
Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code:
Inspection Results: NAP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments: 61
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: �� gk Lic.#: o✓W 7-2 /L
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com