Loading...
HomeMy WebLinkAboutStandard Penetration Boring TestUS South Engineering & Testing Laboratory, Inc. �. 1 00 NW 77 CT,1{ABarni lakes, FL?3016. suite ti20i Phone: 305.558.2588 [Fax: 305.362.4669 December 23rd, 2020 CL Contractors @ 9119 SW 162nd Street Miami, FL 33157 Re: Deep Foundation Recommendation for Proposed Three-story House Residential Property @ 4845 Water song Way, Fort Pierce, FL 34949 USSE Project Number: 20-0205 Dear Sir/Madam: As per your request and authorization, representatives of U.S. South Engineering and Testing Laboratory, Inc. have performed two (2) deep penetration boring tests at the above referenced project. The testing services were performed on December 221d, 2020. This test was conducted to analyze the in -place soil conditions and to provide a foundation recommendation for the proposed three-story residential structure. INTRODUCTION This report presents the result of soil investigations performed for the project named Vacant Lot, located at 4845 Water song Way, Fort Pierce, FL 34949. The sub -surface exploration was performed on December 221d, 2020, in order to analyze the soil conditions and bearing value for the proposed three-story residential structure. SCOPE OF SERVICES The scope of services for this project was the following: l . Performed two (2) deep penetration test results. 2. Report preparation including recommendations. The sub -surface conditions at the site were explored with two (2) deep penetration boring tests. The result of the classification and stratification are shown on the page (4) entitled Soil Deep Penetration Tests Results in this report. It should be noted that soil conditions may vary between soil boring and the stratum interfaces which are shown. The soil boring data reflects information from the specific test location only. We recommend the following deep foundation which can be used for the above referenced site. Analysis and Recommendations Based on our observations, explorations, and evaluation supplemented by a review of subsoil profiles developed from our engineering standard penetration boring tests dated December 22nd, 2020, we conclude that the subsoil conditions at the site are not capable of providing support to the proposed structure on shallow spread footing. Therefore, we recommend the use of deep foundation system of cast -in -place (auger cast) pile to be used to provide the support of design axial compression loads. The table on the next page summarizes our deep foundation system recommendation. Client Number: 20-0205; CL Contractors Vacant Lot @ 4845 Water song Way, Fort Pierce, FL 34949 US South Engineering & Testing Laboratory, Inc. 3. 14400 NW 77 C% Miami Lakes, Fi. 33016. Suite #201 Phone: 305.559.2588 1 Fax:305.362.4669 PILE CAPACITY Type of Maximum Pile, Pile Pile. Lateral Remark Pile Allowable tensile I Lateral Head Axial Load Capacity Capacity Deflection ons Tons • . Tons aches , 14-Inch The depth of each cast -in -place (auger Diameter 35 8 3 0.25 cast) pile is estimates to be Auger Cast 26-28 feet below the existing grade Pile elevation unless refusal is attained. PILE LOAD TESTS: If more than 35 tons design axial loads are desired, we recommend that two (2) in -place pile load tests be performed in compression and tension. The test load (in compression) shall be not less than twice of the desire design load, and the test load in tension shall be at least one-half (%2) of the desire compression load. This test shall be supervised by an experience geotechnical engineer and upon completion; he or she shall issue a certification of acceptance prior to placement of any production pile. Attached is a copy of the Cast -in - Place Pile specification for your review. INTRUSION MORTAR CAST -IN -PLACE PILING SPECIFICATIONS GENERAL 1. All references made to ASTM standards and ACI & Local codes shall be the latest revisions. 2. RELATED WORK A. Cast - In - Place Concrete Pile 3. SOIL BORINGS Soil information was extracted from soil data taken at the site on December 22" d, 2020, by representatives of U.S. SOUTH Engineering and Testing Lab., Inc. 4. SUBMITTALS Submit for review and/or approval. A. Mortar Cube Tests. B. Daily pile construction reports. C. Equipment 5. REFERENCE STANDARDS The reference standards listed below, but referred by basic designation only, formed a part of these specifications to the extent indicated by the references thereto: A. American Society for Testing and Materials (ASTM), publications: A 615M Spec. for Deformed and plain, Billet- Steel bars for Concrete Reinforcement C33 Spec. for Concrete Aggregate C 109M Test for Compressive Strength of Hydraulic Cement Mortars C 150 Spec. for Portland cement B. Florida Building Code, latest edition. Client Number: 20-0205; CL Contractors Vacant Lot Qa 4845 Water song Way, Fort Pierce, FL 34949 US S Engineering & Testing Laboratory, Inc. 144.001!!W 77CT, Miami lakes, F1.330116: Suite #201 Phone: 305.558.2588 1 Fax: 305.362.4669 6.. EXPERIENCE Submit evidence of satisfactory experience of intrusion mortar cast - in place piling for at least five years. PRODUCTS 1. PORTLAND CEMENT Portland cement shall conform to ASTM C-150 Type II. 2. MINERAL FILLER Mineral filler shall be finely powdered siliceous material which possesses the property of combining the lime liberated during the process of hydration of Portland cement. 3. FLUIDIFIER Shall be a compound possessing characteristics which will increase the flow ability of the mixture, assist in the dispersal of cement grains, and neutralize the setting shrinkage of the high - strength cement, "Mortars inter aid" as manufactured by the Grout Supply Company, Brockville, Ohio, of "Intrusion Aid" as manufactured by concrete Chemical, Inc., of Cleveland, Ohio? 4. WATER Potable water. 5. REINFORCING ASTM A615, GRADE 60. Size and number of reinforcing steels shall be determined by Structural Engineer. 6. FINE AGGREGATE Sand will meet the requirements of ASTM C-33, and the following: The sand will consist of hard, dense, durable un-coated rock particles and will be free from injurious amounts of silt, loam, lumps, soft or flaky particles, shale, alkali, organic matter, mica, and other deleterious substances. If washed, the washing methods will be such as will not remove desirable fines, and the sand will subsequently be permitted to drain until the residual -free moisture is reasonably uniform and stable. The sand shall be well -graded from fine to course, with fineness modules between 1.40 and 3.40. The fineness modules are defined as the total divided by 100 of the cumulative percentages retained on U.S. standard sieve numbers 16; 30; 50; and 100. EXECUTION 1. PILE LENGTHS: A. Estimated pile's length: 26-28 feet. The actual lengths will be determined in the field by the geotechnical engineer during installation and based on initial test pile program results. 2. AUGER EQUIPMENT — GENERAL A. The hole through which the high -strength mortar is pumped during the placement of the pile will be located at the bottom of the auger head below the bar containing the cutting teeth. Client Number: 20-0205; CL Contractors Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 US South Engineering & Testing Laboratory, Inc. 14400 NW 77 CT, Miami Lakes, FL 33016. Suite #203. Phone: 305.558.2588 1 Fax: 305.362.4669 B. The auger flighting will be continuous from the auger head to the top of the auger with no gaps or other breaks. C. Augers more than thirty (30) feet in length will contain a middle guide. D. The piling heads should be prevented from twisting by a stabilizing arm. 3. CAPACITY AND SIZE PILE CAPACITY Type of Maximum Pile tensile Pile.Lateral Pile Lateral . Remark Pile - Allowable Capacity ; y' Capacity Head Axial Load (Tons) : `= (Tiros) Deflection Tons nche§ 14-Inch The depth of each cast -in -place Diameter 35 8 3 0.25 (auger cast) pile is estimating to be Auger Cast 26-28 feet below the existing grade Pile elevation unless refusal is attained. 4. PLACE PILING AS FOLLOWS Rotate into the ground a continuous -flight hollow shaft auger to the depths specified or indicated and as follows: A. The piles will be installed to an embedment depth according to pile capacity (estimated) below the existing surface unless refusal is attained. B. Pump the hole fills with high -strength mortar as the auger is withdrawn. Mortar will be pumped through the auger and ejected at the bottom of the auger head. Maintain pressure in the line and keep the bottom of the auger submerged in mortar during filling operations to prevent formation of voids in pile. C. While the mortar is still fluid, place the steel reinforcement as indicated by the structure engineer. Centralizers (spacing devices) should be attached to each bar at its mid -depth and bottom. The type and diameter of the spacing devices should be submitted for review. 5. MIXING AND PUMPING OF HIGH -STRENGTH CEMENT MORTAR A. Use only approved pumping and continuous mixing equipment in the preparation and handling of the mortar. All oil or other rust inhibitors will be removed from mixing drums and pressure mortar pumps. B. The mortar pump will be a positive displacement piston type pump capable of developing pressures at the pump up to 350 psi. C. The minimum volume of mortar placed in the hole will at least equal the volume of the augured hole but not less than the grout factor obtained from the test pile. However, a grout factor of 1.3 is desire. All materials shall be such as to produce a homogeneous mortar of the desired consistency. If there is a lapse in the operation, the mortar shall be re -circulated through the pump. Client Number: 20-0205; CL Contractors Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 UNIFIED SOIL CLASSIFICATION SYSTEM Soil Classification Criteria forAssigning Group Symbols and Group Names Using Laboratory Tests" Group Symbol Group Name Gravels: Clean Gravels: Cu Z 4 and 15 Cc.-5 3 e GW Well -graded gravel F Mare than 50% of Less than 5% fines c Cu < 4 and/or 1 > Cc> 3 E GP Poorly graded gravel coarse fraction retained Gravels with Fines: Fines classify as ML or MH GM Silly gravel •c Coarse Grained Soils: on No. 4 sieve More than 50% retained More than 12% fines c Fines classify as CL or CH GC Clayey gravel on No. 200 sieve Sands: Clean Sands: Cu z 5 and 15 Cc 5 3 E SW Weil -graded sand' 50°% or more of coarse Less than 5% fines ° Cu < 5 and/or 1 > Cc > 3 E SIR Poorly graded sand fraction passes No. 4 Sands with Fines: Fines classify as ML or MH SM Silty sand e• ' sieve More than 12% fines ° Fines classify as CL or CH SC Clayey sand Inorganic: PI > 7 and plots on or above "A line ° CL Lean clay Slits and Clays: PI < 4 or plots below A" line ML Slit Liquid limit less than 50 Fine -Grained Soils: 50°% or more passes the No. 200 sieve Sifts and Clays: Liquid limit 50 or more soils: Liquid limit - oven dried Organic: uymu urns - nui uneu Inorganic: PI plots on or above'A" line PI plots below A" Ina Organic: Liquid limit - oven dried Liquid Ihrdt -not dried organic matter, dark In color, and organic odor Based on the material passing the Sin. (75-mm) sieve a If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. c Gravels with 5 to 12°A fines require dual symbols: GW-GM well -graded gravel with slit, GW-GC wen -graded gravel with clay, GP -GM poorly graded gravel with silL GP -GC poorly graded gravel with clay. ° Sands with 5 to 12°% fines require dual symbols: SW-SM well -graded sand with slit, SW -SC well -graded sand with day, SP-SM poorly graded sand with slit, SP-SC poorly graded sand with clay z E CU = Dadofo Cc (D,) D,o x D, F If soil contains a 15% sand, add 'with sand" to group name. ° If fines classify as CL-ML, use dual symbol GC -GM, or SC-SM. 00 50 v 40 0 Z v 30 20 a to 7 4 0� 0 OL Organic silt CH Fat cla MH Elastic <0.75 OH PT Peat " If fines are organic, add "with organic fines" to group name. If soil contains 215% gravel, add "with gravel' to group name. J If Atlerberg limits plot in shaded area, soil Is's CL-ML, slily clay. K If soil contains 15 to 29 % plus No. 200, add 'With sand" or "with gravel; whichever is predominant. L If soil contains a 30°% plus No. 200 predominantly sand, add "sandy° to group name. "If soil contains a 30°% plus No. 200, predominantly gravel, add "gravelly' to group name. " PI t 4 and plots on or above A" fine. c PI <4 or plots below "A" One. P PI plots on or above A" One. ° Pl plots below A" line. 10 10 20 30 40 50 50 70 80 90 100 110 LIQUID LIMIT (LL) Exhibit C-3 US S Engineering & Testing Laboratory, Inc. 14400 NW 77 CT, Miami La' es, FL 33016. Suite #202 Phone: 305.556.2588 1 Fax: 305,362.4669 D. A pressure gauge should be installed close to the pile rig in order to monitor grout pressure during operations. The gauge should be positioned so that it can be easily observed by the field engineer or geotechnical engineer. E. A mechanical counter should be provided on the grout pump to count the number of pump strokes during the installation of each pile. F. The grout pump should be calibrated prior to initiation of pile installation by pumping grout into a container of known volume. The pump should be calibrated as often as deemed necessary by the field engineer or geotechnical engineer. G. At least two sets of three (3) 2-inch square grout cubes should be made for each day of pile installation, one in the morning and the other in the afternoon. H. After achieving the desired termination criteria, a positive grout pressure should be observed prior to initiating the withdrawal of the auger. A continuous fluid return (first slurry, then grout) out of the top of the hole is the best indication that the maximum possible pressure head is being achieved. The auger should be withdrawn slowly and smoothly so that a positive grout pressure head is maintained in the hole at all times during auger withdrawal. If the withdrawal of the auger becomes erratic, grout pressure suddenly drops, or if the grout supply is interrupted, the auger tip should be reinserted at least 5 feet below the level where the grouting operation was disrupted prior to resuming withdrawal of the auger. The time rate of withdrawal of the auger should be monitored by the field engineer or geotechnical engineer. J. A grout factor equal to or greater than that of the successful test pile should be achieved. The grout factor is defined as the actual volume of grout pumped into the pile divided by the theoretical volume of the drilled hole. Although piles should not be rejected solely on the basis of grout factors less than that of the test piles, the contractor should coordinate the rate of withdrawal of the auger so that the desired target grout factor is achieved. As noted previously, significantly higher grout factors may result due to the porosity of the limestone formations. K. Clockwise rotation of the auger should be performed during the grouting process, at least until grout is observed flowing out of the top of the drilled hole. Auger rotation helps stabilize the sides of the hole, facilitates the removal of spoil material out of the hole, and prevents bearing formation cuttings from settling out to the bottom of the hole during grouting. L. The installation of adjacent piles (located within 3 feet of each other) on the same working day is not recommended. Adjacent piles (located within3 feet of one another) are not to be installed until the grounded pile has set for a minimum of eight (8) hours. M. Some subsidence of fresh grout may occur in the top of the piles. This subsidence is believed to be due to the weight of the grouted column "pushing" the grout laterally into pores in the limestone layer. It is anticipated that this subsidence will occur within a period of about two hours following grouting. If subsidence occurs while the pile grout is in a fluid state (generally with two hours of forming the pile), the pile to be "topped" with Client Number: 20-0205; CL Contractors Vacant Lot C3a 4845 Water song Way, Fort Pierce, FL 34949 US South Engineering & Testing Laboratory, Inc. 14400 NW 77C6, Miami Lakes, FL330I6. Suite € 20I Phone: 305.556.2568 I Fax: 305.362,4669 fresh grout to the proper cutoff elevation immediately. A short length of casing or sleeve inserted into the top of the pile would serve as a good reference to judge whether grout subsidence has occurred. A pile grout subsidence of up to six inches should be considered acceptable for this project. As stated previously, the pile should be refilled as the subsidence occurs. Conscientious monitoring of the pile grout levels will be required by the contractor and installation monitoring personnel. Piles which subside more than 6 -inches in an overnight period or after a two-hour period should be evaluated on an individual basis, to determine their acceptability. 6. HIGH -:STRENGTH MORTAR Use a mixture of Portland cement, mineral filler, fluidifier, sand and water so proportioned and mixed as to provide a mortar capable of maintaining the solids in suspension without appreciable water gain, yet which may be pumped without difficulty and which will laterally penetrate and fill any voids in the foundation material. The materials shall be so proportioned as to provide a hardened mortar having an ultimate compressive strength of 5000 psi at 28 days. The maximum water -cement ratio shall not exceed .45. 7. LOCATION OF PILES A. Locate piles as shown on drawings or as otherwise directed by the architect. Pile centers to be located to an accuracy of plus or minus 3 inches, single piles 1". B. Do not place adjacent piles placed closer than 3 feet center to center until the mortar in the piles have set for a minimum of eight (8) hours. C. In location where there are no concrete slabs or other means of distributing the load of the piling placement equipment, the points where this concentrated load is applied to the soil shall be at least ten feet away from the pile location. This is to prevent the weight of the piling placement equipment from compressing or shearing the soil, which may, in turn squeeze in the top of the pile. 8. PILE TOPS A. Where the pole cutoff is near the surface or above the bottom of the excavation, place sleeves of the proper diameter around the pile tops. B. All pile caps shall be centered under their respective column center lines unless otherwise noted on plans. 9. OBSTRUCTIONS Should any obstructions (including but not limited to boulders and timbers) be encountered which shall prevent placing the pile to the depth required or shall cause the pile to drift from the required location, the pile shall be completed or abandoned as directed. Dense rock layers shall not be deemed obstructions. If required by architect or engineer, an additional adjacent pile shall be placed. Refusal shall be defined as a rate of penetration of the auger of less than one foot per minute. 10. REINFORCING Provide four #5 full lengths with #3 ties at 10 inches on center reinforcing and/or as indicated in the drawings. Client Number: 20-0205; CL Contractors Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 US South Engineering & Testing Laboratory, Inc. 9� 9 9 rYa - 144W Nye 77CT, Miami Lakes, FL 330, 6. Suite ##201 Phone: 305.558.2588 1 Fax: 305.362.4669 11, GROUT TESTING The owner will provide and pay for a testing laboratory to perform the following tests: A.. Test the mortar mix by making two set of three 2-inch x 2-inch cubes for each rig used each day mortar is placed (one in the morning and the other in the afternoon). A set of cubes'shall consist of 3 cubes to be tested at one at seven days and 2 cubes to be tested at 28 days. Test cubes shall be made and tested in accordance with ASTM C 109, with the exception that the mortar should be restrained from expansion by a top plate. 12. PILE INSTALLATION MONITORING A. Prior to actual installation of the piles, the contractor should demonstrate that the materials and equipment proposed for use is capable of installing the production piles. The contractor should provide an accurate method of determining the depth and alignment of the auger. Grout pressure gauges should be accessible to the field geotechnical engineer at all times. Gauges which become blocked with grout should be cleaned or replaced. B. The duties of the pile observer shall include the following: (1) Calibrating the grout pump (in units of cubic feet per stroke). (2) Monitoring the addition of any water and/or admixtures to the grout at the site. Performing flow cone tests, if required. (3) Making grout cubes. (4) Observing the drilling process and noting any relevant irregularities. (5) Approving the pile auguring termination criteria and recording the pile tip elevation prior to pumping. (6) Observing and documenting the grouting procedure, noting the depth to the auger tip during any delays in grouting, and the time of any delay during pumping. (7) Recording the total number of pump strokes for the determination of the actual grout volume pumped into each pile. Calculate theoretical pile volume and grout factor. (8) Recording the grout pressure during pumping and the rate of withdrawal of the auger. (9) Monitoring the setting process of the fresh grout based on the actual samples taken at the time of arrival on -site. Grout which reaches its initial set should not be used. (10) Observing freshly grouted piles to determine whether any settling or grout subsidence occurs. (11) Monitoring the installation of reinforcing steel in the piles. Client Number: 20-0205; CL Contractors Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 -i US South Engineering & Testing Laboratory, Inc. 14400NW77CT, Miami Lakes, FL33016. Suitet201 Phone: 305.558.2586 1 Fax: 305.362.4669 13. PELE LOAD TESTS (If more than 35 tons designs axial loads are desire) A. Two (2) compression load tests are required. The test pile is to be loaded to twice the design load in accordance with Florida Building Code. A test load in tension is also required. The test load shall be at least one-half (%z) of the desire compression load. Monitor and measure one reaction pile for tension capabilities utilizing the same increments and times as the compression tests. B. Provide adequate support for the load testing apparatus and cooperate with the testing laboratory. C. The test pile will be placed in location of a permanent pile in the floor slab area. In the event of test failure, a supplementary pile shall be placed and tested for each failure, at the Contractor's expense. D. Four widely spaced "indicator or probe" piles shall be installed at the site prior to the load testing. The installation of these piles shall be witnessed by the geotechnical engineer. These piles shall be installed in production pile locations and may be used as permanent job piles if the pile load tests are successful. The indicator piles should be installed with the same equipment and using similar methods and procedures planned for the production piles. Following installation of the indicator piles, two of the four piles should be selected for load testing by the geotechnical engineer based on installation behavior and the subsurface profile. Based on the results of the load test and the installation of the indicator piles, the geotechnical engineer shall generate additional pile installation criteria (minimum grout factor, revised termination criteria, etc.) for the production piles, if necessary. Additional recommendations relative to the pile load test program can be provided at the appropriate time. E. The installation of the indicator, test, reaction and production auger cast piles shall be observed by the geotechnical engineer. If unusual drilling characteristics, large grout quantities, or other observed installation irregularities occur during production pile installation that are markedly if different from those recorded when installing the indicator, tests and replacement piles may be required. F. The testing laboratory shall be provided by the Owner. Client Number: 20-0205; CL Contractors Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 US South �- Engineering & Testing Laboratory, Inc. 144001* W 77 C% Miami Likes, FL, 33016. Suite ##201 Phone: 305.658.2588 1 Fax: 305.362.4669 LIMITATIONS The findings and recommendations provided in this report are based on our soil boring data and information collected from the test boring locations. Uniformity of soil strata in the immediate vicinity may be assumed, however, it is not guaranteed, and this office assumes no responsibility of areas other than those where the subsoil investigation was made and reported herein. Experienced geotechnical personnel should observe and document the construction procedures used and the conditions encountered. Unanticipated conditions and inadequate procedures should be reported to the design team along with timely recommendation to solve the problem. We recommend that the owner retain U.S. South Engineering and Testing Lab., Inc. to provide these services based upon our familiarity with the project, the subsurface conditions, and the intent of recommendations and design. The information presented in this report is intended for the exclusive use of CL Contractors. U.S. South Engineering and Testing Laboratory, Inc. will not be responsible for conclusions, opinions, or recommendations made by others based on data presented herein. If deviations from the noted conditions are encountered during remedial application, they should be brought to U.S. South Engineering and Testing Laboratory, Inc.'s attention. CONCLUSIONS The findings and recommendations indicated in this report are based on our soil boring data and information conducted at the test location indicated. Uniformity of soil strata in the immediate vicinity may be assumed, however, it is not guaranteed, and this office assumes no responsibility of areas other than those where the subsoil investigation was made and reported herein. Experienced geotechnical personnel should observe and document the construction procedures used and the conditions encountered. Unanticipated conditions and inadequate procedures should be reported to the design team along with timely recommendation to solve the problem. We recommend that the owner retain U.S. South Engineering and Testing Lab., Inc. to provide these services based upon our familiarity with the project, the subsurface conditions, and the intent of recommendations and design. U.S. South Engineering and Testing Laboratory, Inc. appreciate the opportunity of assisting you in this project. If you have any questions or comments, please do not hesitate to contact the undersigned. and Testing Lab., Inc. Eduar —U TZ6 riguez, Jr., P.E. #56197 Project Manager Re: Deep Foundation Recommendation for Proposed Three-story Residential Structure Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 USSE Project Number: 20-0205 Cc: File copy Client Number: 20-0205; CL Contractors Vacant Lot Q 4845 Water song Way, Fort Pierce, FL 34949 US South Engineering & Testing Laboratory, Inc. - . 144M NW 77 CF, Miami Lakes, FL 33016. Suite #201 Phone: 305.658.2569 1 Fax: 305.362.4669 SOIL STANDARD PENETRATION TEST RESULTS The penetration testing and soil sampling are accomplished simultaneously using procedures in general accordance with ASTM D-1586, the Standard Penetration Test (SPT). A 2-inch O.D. by 1.4-inch I.D. split -spoon samplers is driven with a 140 pounds' hammer falling 30 inches. The number of hammer blows required to drive the sampler is recorded on the borehole logs, which are shown as Soil Standard Penetration Test Results. Where possible, the sampler is driven 24 inches, with the hammer blows being recorded for each of four 6-inch intervals. The "Penetration Resistance" or "N" value is the sum of the blows recorded for the second and third six-inch intervals. This value is widely accepted by geotechnical engineer as an indication of the relative density and strength of the soil being sampled. Client Number: 20-0205; CL Contractors Vacant Lot ® 4845 Water song Way, Fort Pierce, FL 34949 a 'k.4114-Y+` 5 iy 1 '5 Watersong Way 5 J�fC�Af8{2 wt r 1 t -41 Data SIO: N0."""". U.S. Navy, N GE • +`FJ \ a ti: D 2020 Googte g �rvu�`. ..:3 .�.-°-'_ t O• it ' U.S. SOUTH ENGINEERING & TESTING LAB., INC. 14400 NW 77th Court, Suite #201, Miami -Lakes, FL 33016 TEL : (305) 558-2588 FAX : (305) 362-4669 TEST BORING REPORT Client: CL Contractors Order No. 20-0205 Project: Vacant Lot - Proposed Three-story House Report No. Br#1 Site Address 4845 Watersong Way, Fort Pierce, FL 34949 Hole No. Br#1 Test Location see site plan Start date 12-22-20 Driller: A.A. & J.M. Finish date 12-22-20 DEPTH DESCRIPTION SAMPLE HAMMER BLOW ON "N" REMARK Test Depth NO. SAMPLE ft From 0'-0" to 0'-6" Dark brown medium sand with 01 some organic fiber 6 5 S -1 13 0-2 From 0'-6" to 3'-0" Dark tan brown medium sand with trace of marl 02 8 11 03 10 14 S - 2 24 2-4 04 From T-0" to 6'-0" Light gray rough beach sand 10 10 with trace of seashell and sand stone with trace 05 of marl 11 12 S-3 22 4-6 06 10 11 07 From 6'-0" to 14'-0" Dark gray medium sand with 11 1 8 6-8 trace of clay like material S - 4 13 08 5 5 Water Table @ 6'-3" 09 3 3 S-5 6 8-10 10 3, 2 11 3 3 S-6 9 10-12 12 6 6 13 6 8 S-7 18 12-14 14 10 10 • 15 From 14'-0" to 16-0" Tan medium sand with 11 38 sandstone S - 8 80 14 -16 16 42 55 17 From 16'-0" to 19'-0" Augered down very hard layer of rock / stone S-g Augered - 16 -18 18 Down Very Hard Layer 19 S-10 10 18 - 20 20 From 19'-0" to 30'-0" Tan medium sand with -T- 10 12 some rock ***As further protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.*** U.S. SOUTH ENGINEERING & TESTING LAB., INC. 14400 NW 77th Court, Suite #201, Miami -Lakes, FL 33016 TEL : (305) 558-2588 FAX: (305) 3624669 TEST BORING REPORT Client: CL Contractors Order No. 20-0205 Project: Vacant Lot - Proposed Three-story House Report No. Br#1 Site Address @ 4845 Watersong Way, Fort Pierce, FL 34949 Hole No. Br#1 Test Location see site plan Start date 12-22-20 Driller: A.A. & J.M. Finish date 12-22-20 DEPTH DESCRIPTION SAMPLE NO. HAMMER BLOW ON SAMPLE "N" REMARK Test Depth eft) 21 continued... From 19'-0" to 30'-0" Tan medium sand with some rock S -11 11 9 18 20 - 22 22 9 10 23 15 15 S-12 29 22-24 24 14 18 25 18 18 S -13 46 24 - 26 26 28 26 27 25 26 S-14 54 26-28 28 28 28 29 29 31 S-15 61 28-30 30 30 30 31 From 30'-0" to 33'-6" Light tan medium sand with 36 35 sandstone S -16 70 30 - 32 32 35 39 33 40 63 S -17 123 32 - 34 34 60 Boring Terminated @ 33'-6" 35 S-18 34-36 36 37 S-19 16-18 38 39 S-20 18-20 40 ***As further protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.*** U.S. SOUTH ENGINEERING & TESTING LAB., INC. 14400 NW 77th Court, Suite #201, Miami -Lakes, FL 33016 TEL : (305) 558-2588 FAX: (305) 3624669 TEST BORING REPORT Client: CL Contractors Order No. 20-0205 Pro'ect: Vacant Lot - Proposed Three-story House Report No. Br#2 Site Address @4845 Watersong Way, Fort Pierce, FL 34949 Hole No. Br#2 Test Location see site plan Start date 12-22-20 Driller: - A.A. & J.M. Finish date 12-22-20 DEPTH DESCRIPTION SAMPLE NO. HAMMER BLOW ON SAMPLE "N" REMARK Test Depth (ft) From 0'-0" to 0'-6" Dark brown medium sand with 01 trace of rock 4 4 S -1 10. 0-2 From 0'-6" to 4'-0" Brown medium sand 02 6 10 03 9 9 S-2 19 2-4 04 10 11 05 From 4'-0" to 7'-0" Light gray rough beach sand with trace of seashell, sandstone and marl S - 3 10 10 22 4-6 06 12 10 07 10 17 6-8 S -4 21 08 From 7'-0" to 14'-0" Dark gray medium sand with g y trace of clay like material 4 3 Water Table @ 6'-2" 09 4 3 S-5 6 8-10 10 3 4 11 4 4 S-6 9 10-12 12 5 6 13 5 7 S-7 16 12-14 14 9 10 15 From 14'-0" to 16'-0" Tan medium sand with sandstone S - 8 18 23 91 14 -16 16 68 60 17 From 16-0" to 19'-0" Augered Down Very Hard Layer of rock / stone 3-9 Augered - 16-18 18 Down Very Hard Layer 19 S-10 11 18 - 20 20 From 19'-0" to 30'-0" Tan medium sand with some rock 11 10 'As further protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.**" U.S. SOUTH ENGINEERING & TESTING LAB., INC. 14400 NW 77th Court, Suite #201, Miami -Lakes, FL 33016 TEL : (305) 558-2588 FAX: (305) 3624669 TEST BORING REPORT Client: CL Contractors Order No. 20-0205 Project: Vacant Lot - Proposed Three-story House Report No. Br#2 Site Address @ 4845 Watersong Way, Fort Pierce, FL 34949 Hole No. Br#2 Test Location see site plan Start date 12-22-20 Driller: A.A. & J.M. Finish date 12-22-20 DEPTH DESCRIPTION SAMPLE NO. HAMMER BLOW ON SAMPLE "Not REMARK Test Depth (ft) 21 continued... From 19'-0" to 30'-0" Tan medium 9 9 sand with some rock S -11 18 20 - 22 22 9 8 23 10 14 S -12 30 22 - 24 24 16 15 25 19 20 S-13 40 24-26 26 20 21 27 21 21 S-14 41 26-28 28 20 18 29 23 25 S-15 50 28-30 30 25 30 31 From 30'-0" to 36'-0" Light tan medium sand with 29 31 some sandstone S -16 63 30-32 32 32 30 33 36 36 S-17 74 32-34 34 38 40 35 48 63 S-18 122 34-36 36 59 60 37 Boring Terminated @ 36'-0" S-19 16-18 38 39 S-20 18-20 40 ***As further protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.**" GENERAL NOTES DRILLING &SAMPLING SYMBOLS: SS: Split Spoon —1 y/e" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin -Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger RS Ring Sampler - 2.42" I.D., 3" O. D., unless otherwise noted HA: Hand Auger DB: Diamond Bit Coring - 4", N, B RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch O.D. spilt -spoon sampler (SS) the last 12 inches of the total 18-Inch penetration with a 140•pound hammer failing 30 indres is considered the "Standard Penetration° or "1 -value'. WATER LEVEL MEASUREMENT SYMBOLS: WL: Water Level WS: While Sampling NIE: Not Encountered WCI: Wet Cave in WD: While Drilling ESH Estimated Seasonal High Groundwater DCI: Dry Cave in BCR: Before Casing Removal ESL Estimated Seasonal Low Groundwater AB: After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times Indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In tow permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 500A of their dry weight retained on a 4200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 60% of their dry weight retained on a #200 sieve, they are principally described as days If they are plastic, and slits if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse -grained soils are defined on the basis,of their In -place relative density and fine-grained soils on the basis of their consistency. CONAMATENCYOF FINE-GRAINED SOILS RELATIVE DENSITY OF COARSE -GRAINED SOILS Unconfined Standard Penetration Standard Penetretton Compress hre or N-value (SS) Consistency or N-value (SS) Retajtire Densitu Strenath, Qu. ad Blowe/Ft. RIODgm < 500 0-1 Very Soft 0-3 Very Loose 500 —1.000 2-4 Soft 4-9 Loose 1,001-2,000 4-8 Medium Stiff 10-29 Medium Dense 2,001— 4.000 8 —15 Stiff 30 — 49 Dense 4.001-8,000 15-30 Very Stiff > 50 Very Dense 8,000+ > 30 Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Descriptive Term(e) of oHreC Percent of Vlalor Component Constituents Dry Welaht of Sample pa d Slza Trace < 15 Boulders Over 12 In. (300mm) With 15 — 29 Cobbles 12 in. to 3 in. (300mm to 75 mm) Modifier > 30 Gravel 3 in. to 04 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm) Silt or Clay Passing 0200 Sieve (a(75mm) RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION Descriptive Term(s) of other Percent of Term Plasticity Constituents Dry Welaht ftL ex Trace < 5 Non-plestic 0 With 6-12 Low 1-10 Modifiers > 12 Medium 11— 30 High > 30 Exhibit C-1 GENERAL NOTES Description of Rock Properties WEATHERING Fresh Rodk fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline. Very slight Rods generally fresh t joints stained, some joints may show thin clay coatings, crystals in broken face show bright Rods dnp,under hammer if crystalline. Slight Rock generally fresh, joints stained, and discoloration extends Into rodc up to 1 in. Joints may contain day. In grantold rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer. Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength as compared with fresh rock. Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority show kaolinization. Rods shows severe loss of strength and can be excavated with geologist's pick Severe All rock except quartz discolored or stained. Rock 'fabdedear and evident, but reduced In strength to strong soll. In grartitold rocks, all feldspars kaolinized to some extent Some fragments of strong rock usually left. Very severe All rock except quartz discolored or stained. Rock °fabrics discernible, but mass effectively reduced to'sdl' with only -fragments of strong rock remaining. Complete Rock reduced to'sk>il°. Rocc'fabric' not discemlble or discernible only in small, scattered locations. Quartz may be present as dikes or stringers. HARDNESS (for engineering description of rock- not to be confused with Moh's scale for minerals) Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of geologist's pick, Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen. Moderately hard Can be scratched with knife or pick Gouges or grooves to % in. deep can be excavated by hard blow of point of a geologist's pick. Hand specimens can be detached by moderate blow. Medium Can be grooved or gouged 1/1e In. deep by fine pressure on knife or pick point Can be excavated in small chips to pieces about 1-In. maximum size by hard blows of the point of a geologist's pick. Soft Can be gouged or grooved readily with knife or pick point Can be excavated In chips to pieces several inches in size by moderate blows of a pick point Small thin pieces can be broken by finger pressure. Very Soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 14n. or more in thickness can be broken with finger pressure. Can be scratched madly by fingernail. Joint, Bedding and Foliation Spacing In Rook' Spacing Joints BeddinglFoliation Less than 2 In. Very close Very thin 21n. -I ft Close Thin 1 R. - 3 fL Moderately close Medium 3 ft. -10 ft. Wide Thick More than 10 fL Very wide Very thick Rock Quality Designator (RQD)b Joint Openness Descriptors RQD, as a percentage Diagnostic description Openness Descriptor Feeding 60 Ekcellent No Vlsible Separation Tight 00- 75 Good Less Oran 1/321n. Slightly Open 76- 50 Fair 1132 to 1/8 In. Moderately Open 50 - 26 Poor 118 to 318 In. Open Las than 25 Very poor 3/8 in, to 0.1 it. Moderately Wide Greater than 0.1 ft. Wide a. Spacing rerers to the aistance normal to the planes, or the clescrinea feature, wlvcn are parattei to each other or nearly so. b. RQD (given as a percentage) = length of core in pieces 4 In. and longerfiength of run. References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56, Subsurface Investlaatlon for Design and Construction of Foundations d Bulldinas. New York: American Society of Civil Engineers,1078. U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manuel. Exhibit C-2