Loading...
HomeMy WebLinkAboutRevisions; Joist HangerOFFICE USE ONLY: DATE FILED: 80 Q71. REVISION FEE: PERMIT 9 PQC9 - 06 RECEIPT PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982.5652 (772) 462-1553 RECEIVED I- c "' 0 8 2 0 at. LWOW coun', Permittin�, DETAILED DESCRIPTION OF PROJECT REVISIONS: (0 aly � et 1 - r-, 1) cl, r- R FAS'r eumt T'0 C3 S )a' 0 A(b Lo- ixc; U.) r--OG rz - SOU DTP Ye eq j lot) po 1GTatSr tiANGi�R AT le#4Ctf t4C (9) lod CONTRACTOR INFORMATION: STATE of FL REGICERT. 4: BUSINESS NAME: QUALIFIERS NAME: ADDRESS: CITY: PHONE (DAYTIME): _ STATE: FAA NAME: 1--,' 11 U y ftl L I H ADDRESS:_ &IG A)" mal) CIL/, CITY: STATE: PHONE (DAYTIME): SLCCC.- 9123109 Revised 0613 0/17 ST. LUCIE CO CERT. 4: ZIP: FAX: I ZIP: 6 1 FAX: lvltq t FAX: Plan Scale: 1 /4",-- 0' Q 0 O 0 0 0 5 "i la - Scale: 1 /4""= V-0" Exterior CBS wal Top of Grout Fill Perimeter Beam fl --- _ . tD r P \ M m (1) 2 x 8 p.t. Ledger 00 i Fasten to CBS 1 /2- dia. irs 0 6"" long wedge bolts with 1 /8""x 2""washers 24"o.c. � staggered N \ � o41 r r M y I o � Fill two courses of T CD CBS along Landing h Ledger solid with Grout o I _y r T-2" (5) Treads at 10" 1 1/2" rmin. LUS26 Joist Hanger 'at each joist with (4) '10d to header & (4) 10d to Joists (2) 2 x 12 Beam with (2) 2 x 4 Ledger attached sir Section Scale: 1 /2"= V-0" �qh (2) 2 x 8 p.t. Ledger Fasten to CBS 1 /2" dia. 8"" long wedge bolts 24"-o.c. staggered 9,-2"" (10) Treads at 10- Wall Mount Handrail 36" above Tread with 1 1 /2"" Grip Surface 1 1 /2"" min. from wall 2 x 12 Stringer Three Places -� (1) at each side and (1) in center 1 /2' d.w. on underside of stringers & landing Simpson HU48 Hanger with (14) 1/4""x 2 3/4"" Titen to CMU and (6) 10d to beam Fe-1I01 C 11�1l Handrail at 36"" above Tread with 1 1 /2" Grip Surface. 1"Nos 2 x 4 p.t. plate fastened to concrete with cased - hard coil nails. Plate cont. along with of stairs (1)2x8 Ledger c a Cover Joists with 2 x 6 Joists X 3/4""T&G plywood 16"o.c. Cq Glued & Screwed to N floor trusses per Nail Schedules CZa2 "x6 Column LUS26 Joist Hanger Simpson HUSC210-2 at each joist with (4) o Hanger with (8) 16d to 10d to header & (4) 10d to Joists Column and (8) 16d to Beam. Typ. (2) places Stair Laridirig B Z calc: 1/2 "= V-0- 9,-0- 2 x 4 cont. Horiz. fasten with (2) 3- wood screws at each intersection I 3/4T&G plywood Glued & Screwed to floor trusses per Nail Schedules—, pre engineered trusses 24"-o.c. 1 /2""d.w. TOILET O wood base see footing details 2 x 6 cont. cap 2 x 4 Vertical at 48'o.c. Fastened to the side of the floor truss with (6) 16d nails 2 x 4 to extend up from the top plate 2 x 6 cont. (2) 2 x 4 plate with SP4 with (6) 10d x 1 1/2- at each stud " --1 /2" gyp. d.w. 2 x 4 studs 16""o.c. 2 x 4 p.t. plate with SP4 with (6) 10d x 1 1 /2" at each stud Bearing a AND LOFT SECTk,,r.= .1 1 /2" dia. wed&e bolt with 3" x 1 /8 washer 7"" embedment 24""o.c. 5V CRIMP METAL ROOFING 12 ON "PEEL AND STICK" UNDERLAYMENT OVER 5/8"" C.D.X. PLYWOOD 5 SEE CONNECTOR SCHEDULE GALV. DRIP EDGE ON 1 x 3 P.T. ON 2 x 8 PRE ENG. WD. CEDAR FASCIA -\ TRUSSES 24"c.c. 2 x 4 BLOCKING CONT. BETWEEN TRUSSES ALONG FASCIA & WALL & AT CENTER OF OVERHANG 2'-0' VINYL VENTED SOFFIT GRADE er T.0 B (2) COURSE BOND BEAM WITH (1) #5 REBAR FILLED WITH GROUT EACH COURSE 8x16x8C.M.U. WITH #5 VERT. DOWEL IN GROUT FILLED CELLS 5"" 3000# CONCRETE WITH 6" 10/10 WELDED WIRE MESH OVER .006 VAPOR BARRIER ON CLEAN, COMPACTED, TERMITE TREATED FILL i a.aA. ' '' �7 l' j.F s LO 00 ( y� i. U q _.. r-, Jl- eel 4" a � c LU << C 0 C 1-a date I revision 10/4/21 1 Stair Landing drawn s.l. checked s.l. date 3/5/2020 -U t- —1 7 (Dn 3 CDn m ca c° n o scale as noted INS 0 job numbe 19 mbo 77 sheet V`De ovi V i3oc