HomeMy WebLinkAbout21-139C - Bryn Mawr Condos 2021 - Bldg C - Rep 7 - 10.19.21M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139C Report No. 7
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 1 of 3
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. C
5055 N. HWY A1A, FORT PIERCE, FL 34949
SLC BLDG. DEPT. PERMIT NUMBER: 2106-0415
PROJECT NAME: Bryn Mawr Condominiums Concrete
Repairs 2021 – Bldg. C DATE: October 19, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL
CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
• Limited access balconies – Units 201, 401, 601, 801, & 901.
OBSERVATIONS:
Unit 201
• Edge repair required at the north balcony and a there is a small ceiling spall at the east balcony.
• The new waterproofing and topcoat have been placed at the edge repair to match the surrounding areas.
• Stucco finish has been applied to the repaired areas.
Unit 401
• A total of (56) corroded fasteners from old shutter tracks were removed at the west facing balcony.
Unit 601
• The surface spall adjacent to the east facing sliding glass door has been repaired.
• The sliding glass doors did not require removal, as the corrosion did not go into the unit.
Unit 801
• The temporary wall inside the unit has been removed.
• The sliding glass doors and adjacent hurricane shutters have been re-installed.
• Repairs to the balcony include ceiling spalls (inside and outside of unit) and partial surface and edge spalls.
Unit 901
• The loose & cracked stucco was removed from the north facing concrete column.
• The column was found to be sound, and the stucco was replaced.
RECOMMENDATIONS:
• Provide a paint primer on the new stucco at all repaired areas.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139C Report No. 7
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 2 of 3
Pic 1 – Unit 201
Edge repair at north elevation.
Pic 2 – Unit 401
Rust spot fasteners removed in ceiling.
Pic 3 – Unit 401
Rust spot fasteners removed in balcony floor.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139C Report No. 7
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 3 of 3
Pic 4 – Unit 601
Surface spall repaired & waterproof coating applied.
Pic 5 – Unit 801
Edge and ceiling spall repair.
Pic 6 – Unit 901
Stucco repair.