Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 5 Code 139 (2).pdf
UNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: / ci - 2nh S1-_ Q / Permit No. Project: Ph Xil::Ll Address: 3 3 ,Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: l o - � Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -in Rough -in Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock I Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Results: Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspectors ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ Not Ready Lic.#: '725Z OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com