HomeMy WebLinkAbout30 power release-SENT IN AT SUBMITTAL TIME, ADVISED TOO EARLY TO SENDPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
Request for 30-Day Temporary Power Release
Date:
Permit Number:
Prajea Address: 160 Nettles Blvd. Jensen Beach, FL 34957
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE
REQUEST- WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
I. This temporary power release is requested for the above stated purpose only, and there will be no
Occupancy of any type, other than that permitted by construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement,
including Building Division Policy, which is incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled "Requirements For 30 bay
Power for Testing" have been fulfilled and the premise is ready for compliance inspection.
4. All requests For an extension beyond 30 days mast be made in writing to the Building official stating
the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if
the Final Inspection has not been approved within 30 days. A fee of $100.o0 will be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF TRANSA ON, INCLUDING ANY DAMAGE WHICH MAY Bl INCURRED DUE TO THE D COJ�
N Oi E' CTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
OWNER
DATE
DATE
SIGNATURE DATE