Loading...
HomeMy WebLinkAboutRe - Roof FormsST. LUCIE Section A (General Information) Master Permit No. Process No. Contractors Name: Total Home Roofing License # CCC1330489 JobAddress3qqV rcw L,wr-) b JC( rov k A yC e R-3,VL ROOF CATEGORY Low Slope ❑ Mechanically Fastened Tile ❑ Mortar/Adhesive Set Tiles Asphaltic Shingles ❑ Metal Panel/Shingles Mood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance PQ Reroofing ❑Recovering . ROOF SYSTEM INFORMATION` Low Slope Roof Area (SF) 4 I-L Steep Sloped Roof Area (SF) Z33 Z Total (SF) s Section B (Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. ■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■�■■■■■■■■■■■■■■■■■ MEN! ■■ MIN MEN IMM■■■■■■■■■■■■■ MEN MEMO ■■■■■■■■■■■■■■■■■■ ENNNOME 010 EM1 MEMEMEMEME■ IMM ■■■■■■ OEM ®■■■■■■■■■■■■� ■■■■■■■■■■® ■■■■■■■■■■■ ■ 10115/21, 2:00 PM 32500_35807_1.jpg(800x800) https://pasic.gov/lmageSkelches/sketch/32/32500_35807_1.jpg 1/1 ST. LUCIE FORKS Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer:_Certainteed Product Approval No.: FL2533-R24 Design Wind Pressures, From RAS 128 Or Calculations: Zone 1':-34.6Zone 1&0.3Zone 2: Zone 3:: 06.4 Max. Design Pressure, from the specific product approval system: -127.5 Deck: Gauge Thickness: 1 /8n Slnne. Q ) 1 Anchor/Base Sheet & No. df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: Insulation Base Layer: Base Insultation Size and Thickness: Base Insulation Fastener/Bonding Material: Top Insulation Layer: Top Insulation Size and Thickness: Top Insulation Fastener/Bonding Material: Base Sheet(s) & No. of Ply(s): FIIF1flaStlC Base Sheet Fastener/Bonding Material: Ply Sheet(s)' & No. of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: FllntlegfiD Top Ply Fastener/Bonding Material: Surfacing: Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':—" oc @ Lap, # Rows— ® —' or Zone 1—"oc@ Lap, # Rows _®—"o Zone 2:_" oc @ Lap, # Rows — ® "oc Zone 3:—" oc @ Lap, # Rows— ® —" oc Number of Fasteners Per Insulation Board: Zone 1':—Zone 1:—Zone 2:_Zone 3:_ Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc... Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. Flintlastic Flintlastic FT. Parapet Height FT. 15' Mean Roof Drip Edge: 3" X 3" Galy Alum Height ST. LUCIE WORKS Section D (Steep Slope Roof System) Roof System Manufacturer: Owens Cornl Notice of Acceptance Number: FL10674-R16 Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1:'Z�one 2e: -74 —Zone 2n"10�one 2rf'10�one 3e-108 one 3r: 128 Deck Type: I Wood \ypendent Q t�' U� Roo;Slope: 12 N/A rrier: N/A Ridge',Bee! 7�tener Type & Spacing: > >/ing ank Nai s IIJJ Adhesive Type: N/A Type Cap Sheet N/A Mean RooPHeight: i r,' Roof Covering I Asphalt Shingles Type & Size Drip 3" X 3" Galy Alttm Edge: