HomeMy WebLinkAboutEngineering 0 dft.
• �_,
q,ayb E b b stone CIVIL, STRUCTURAL &WATER RESOURCE ENGINEERING
October 27, 2021
Mr. David Johnson
Chief Building Inspector
St. Lucie County Planning & Developmental Services i RECEIVED
RE: Engineering Certification for OCT 2 7 2021
4006 Avenue P St.Lucie COUn[y
Fort Pierce, Florida 34947 Permittinc
House Repair Plans
Per your request, the following certification is submitted:
ENGINEER'S CERTIFICATION
This letter and the information contained within have been prepared solely for the use of St. Lucie County
Planning& Developmental Services . This letter is based solely upon the information made available to or
gathered by Jacques Registe, P.E.. I do not assume responsibility for unforeseen conditions, or conditions not
recognized as unacceptable at the time this letter was prepared. This letter is based solely on the visual inspection
of the structure and no testing of materials was performed. I prepare this letter, and make the following conclusion
in a manner consistent with sound practices, level of care, and the skills normally exercised by members of the
engineering profession operating under similar circumstances.
This letter and the discussion contained herein shall not, in whole or in part, be disseminated or conveyed to any
other party or used or relied upon by any other party, in whole or in part, without prior written consent.
I, Jacques Registe, P.E., hereby state that this letter is,to the best of my knowledge and belief,true and correct and
represents the described work in accordance with current established engineering practices. I hereby certify that I
am a Licensed Professional Engineer in the State of Florida practicing with Ebbstone,Inc.. I have supervised and
performed some of the work for the referenced house. All four floor joists that were added were properly installed
and tied own per the building codes. The existing floor joists were tied down and are structurally adequate to carry
the load. The addition plywood that was installed on the floor would not adversely impact the structural integrity of
the house. The bottom sheeting installed to the floor joists provide additional strength tol the structure. The drop
down plywood to cover the plumbing is purely aesthetic and was installed to not adversely impacted the structure.
I certified that the all the repair work was built in accordance with the latest Florida Building Codes and the
revised design plans prepared by me and submitted on July 22, 2020.
I also certified that I am leaving in the house and do not intend to sell in the near future.
Sincerely,S
Ebbstone Inc r- -
,''��4
C 1 :s
Jacques.Registe,-P`E
Chief Engineer.'.
FloridaPE.A 4339T-
rbstone.corn
I