133 MATERIAL TESTING ENGINEERING
3111 F_ s s e n c 0 o f P e r f (.� c t i o n
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801
August 9, 2021
Bodax Foundations, Inc.
1101 NW 55th Street
Ft Lauderdale, FL 33309
Project No. 21-0410
Re.: Auger Cast Pile monitoring for the Caruso Residence House.
4805 Watersong Way Drive, Fort Pierce, 34949.
Dear Sir,
Pursuant to your request, BIII MATERIAL TESTING ENGINEERING, LLC. conducted Auger Cast
Pile monitoring for the above -referenced location on July 30, 2021.
The work involved the installation of twenty-six (26), 14" diameter cast in place piles installed. The
approximate grout volume used was 1374.45 c.f. (50.90) yards). Attached monitoring logs, as well
as the sketch showing the location of piles, are enclosed along with this letter.
We appreciate the opportunity to have been of service to your company. Please feel free to contact
us if there is any question or comments pertaining to this letter.
RPcr��r�irrl�Ai�m'�14[s.�` .
rTi
"Danga efrero, P:° , P
r�
BIII"MO,te.?.4lr,Te�tting,ngineering, LLC.
9+'gy4 a l A A��pp
Parse 114
B3 MATERIAL TESTING ENGINEERING
E s s e n c c o f P o r f c c 1. i o n
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801
A' G E R E D CAST F I LE LOG
Paige 2 1 4
133 MATERIAL TESTING ENGINEERING
E3111 P , r t .:I,,(,
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 796.611, Url
REPORT OF AUGERED CAST IN PVACF Pill Fc
B3 PROJECT NO.
21-0410
DATE
30-Jul-21
CLIENT
ADDRESS
CONTACT
Bodax Foundations
1101 NW 55th Street. Fort Lauderdale, FL 33309
Michael Assam
WEATHER
Sunny
TIME JOB STARTED
9:30 AM
TIME JOB FINISHED
545 PM
PROJECT
ADDRESS
Caruso Residence (House)
4805 Watersong Way, Ft.Pierce 34949
1
Columns No,
1
2
3
4
5
6
7
8
9
10
2
Pile No.
6
1
2
7
4
3
10
16
22
26
3
Augered 0 (inches)
14
14
14
14
14
14
14
14
14
14
4
Pile Length (feet)
26
26
26
26
26
26
26
26
26
26
5
Theoretical Pile Volume (cf)
27.8
27.8
27.8
27.8
27.8
27.8
27.8
27.8
27.8
27.8
6
Number of pump strokes
50
51
52
51
49
51
48
42
52
52
7
Volume per Pump Strokes (cf)
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
8
Actual Grout Volume (cf), (6`7)
52.5
53.6
54.6
53.6
51.5
53.6
50.4
44.1
54.6
54.6
9
Volume Ratio (cf), (815)
1,89
1.93
1.96
1.93
1.85
1.93
1.81
1.59
1.96
1.96
10
Reinforcing Size
6#6
6#6
6#6
6#6
6#6
6#6
6#6
6#6
6#6
6#6
11
Reinforcing Length (ft)
26
26
26
26
26
26
26
26
26
26
12
Grout Truck Number
8002
8002
8002
8002
7008
7008
7008
7008
8001
r uinP canuiauun aaLe:
* Hous
Field Rep
David C
Pump calibration strokes: 1.05 (cf. per strokes)
26 piles in total ; 6#6 with #3 ties @ 6" o.c. Full w/ hooks.
Fla. Reg.. 7746
As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of.clients„and au horization for,eublicatj' n of statements,
conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reprod6ced, except in pl w hoy[4he per "'Written approval for B3
Material Testing Engineering, LLC.
133 ME3 III IATERIAL TESTING ENGINEERING
1.
'';i
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801
REPORT OF AUGERED CAST IN Pi arF au Fc
63 PROJECT NO.
21-0410
DATE
30-Jul-21
CLIENT
ADDRESS
CONTACT
Bodax Foundations
1101 NW 55th Street. Fort Lauderdale, FL 33309
Michael Assam
WEATHER
Sunny
TIME JOB STARTED
9:30 AM
TIME JOB FINISHED
5:45 PM
PROJECT
ADDRESS
Caruso Residence (House)
4805 Watersong Way, Ft.Pierce 34949
r_tVECf a:(M_1.7 ■ U I III1'1r'gTd
1
Columns No.
11
12
13
14
15
16
17
18
19
20
2
Pile No.
25
24
23
18
20
19
21
17
11
12
3
Augered G (inches)
14
14
14
14
14
14
14
14
14
14
4
Pile Length (feet)
26
26
26
26
26
26
26
26
26
26
5
Theoretical Pile Volume (cf)
27.8
27.8
27.8
27.8
27.8
27.8
27.8
27.8
27.8
27.8
6
Number of pump strokes
52
52
52
51
51
52
52
49
51
48
7
Volume per Pump Strokes (cfI
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
8
Actual Grout Volume (cf), (6`7)
54.6
54.6
54.6
53.6
53.6
54.6
54.6
51.5
53.6
50.4
9
Volume Ratio (cf), (815)
1.96
1.96
1,96
1.93
1.93
1.96
1.96
1.85
1.93
1.81
10
Reinforcing Size
6#6
6#6
6#6
6#6
6#6
6#6
6#6
6#6
6#6
6#6
11
Reinforcing Length (ft)
26
26
26
26
26
26
26
26
26
26
12
Grout Truck Number
8001
8001
8001
4009
4009
4009
4009
7001
7001
7001
uI, - I Uace. Nump calibration strokes: 1.05 (cf. per strokes)
* House; 26 piles in total ; 6#6 with #3 ties @ 6" o.c. Full W/ hooks.
Respectfully Submitted;
Da i ewe o;P.E.:;::r
Field Rep.: David C Fla" Rb' g. #677,96
As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients and autgbOaatfop fob p
conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduegcI,1 exceP; in` fbll X� hput lie
Material Testing Engineering,LLC. ,A •.: ,.f,t.�
lion of statements,
written approval for 133
133 MATERIAL TESTING ENGINEERING
E3 III F '
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 796.675sRn1
REPORT OF AUGERED CAST IN P1 ArF Pii Fc
B3 PROJECT NO.
21-0410
DATE
30-Jul-21
CLIENT
ADDRESS
CONTACT
Bodax Foundations
1101 NW 55th Street. Fort Lauderdale, FL 33309
Michael Assam
WEATHER
Sunny
TIME JOB STARTED
9:30 AM
TIME JOB FINISHED
545 PM
PROJECT
ADDRESS
Caruso Residence (House)
4805 Watersong Way, Ft.Pierce 34949
ALIGFRCAST PII Fc 1 nrr
1
Columns No.
21
22
23
24
25
26
2
Pile No.
13
14
9
5
15
8
3
Augered G (inches)
14
14
14
14
14
14
4
Pile Length (feet)
26
26
26
26
26
26
5
Theoretical Pile Volume (co
27.8
27.8
27.8
27.8
27.8
27.8
6
Number of pump strokes
42
52
52
52
51
52
7
Volume per Pump Strokes (cf)
1.05
1.05
1,05
1.05
1.05
1.05
8
Actual Grout Volume (cf), (6*7)
44.1
54.6
54.6
54.6
53.6
54.6
9
Volume Ratio (cf), (815)
1.59
1.96
1.96
1.96
1.93
1.96
10
Reinforcing Size
6#6
6#6
6#6
6#6
6#6
6#6
11
Reinforcing Length (ft)
26
26
26
26
26
26
12
Grout Truck Number
7001
7005
7005
7005
7005
UdU-. Hump calibration strokes: 1.05 (cf. per strokes)
* House; 26 piles in total ; 6#6 with #3 ties @ 6" O.C. Full w/ hooks.
Respectfully Submitted;
1 1
Field Rep.: David C �d
la. 96
ports are submitted as the confidential property of clients, and authdrization for publitAion of statrjment's,
As a mutual protection to client, the public and ourselves, all re ':•., ,�
conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior writ%atrgval€Ar 133°
Material Testing Engineering, L-C. r; : {
B3 MATERIAL TESTING ENGINEERING
3111 E s s e n c c o ( I' e r f c c t i n
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801
SJTE SKETCH
Page314
0
M _N% �M-s mffI
ME fsca. CmEWL'
g'rp-
ILI- __1
� 1 � n� M�:� �...r`M�n,�:ae...��T
—
�
nl
�
ING
k-r'FS IN'STIE
CA-U.- RCPIOCNCS
BTAU -RAL PLANK
�., csr
[fill I
PILE DETAR
B3 MATERIAL TESTING ENGINEERING
E o n c. c c) f 0 r r o c t i o n
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801
DAILY T11 ME SHIEETS
V-1
P age 4 14
)� 1)3y
B3 MATERIAL TESTING ENGINEERING
E s s o n c o o f P o r f o c t: i o n
1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801
DAILY TIME SHEET
CLIENT NAME: -0,5do DATE 0-7 j _io/ L �
ADDRESS:
PROJECT 5T'
PROJECT ADDRESS �tOS (ti a6&o WC4 34+il
TIME STARTED: �.'`,l) TIME END %`tom P V� TRAVELING TIME
i
COMMENTS: 1
Prepared by: Approved by:
Page 1 1 1