Loading...
HomeMy WebLinkAboutCreeside Lot 13 Code 300.pdf@UNiVERSAL 01 ENGINEERING SCIENCES INSPECTION RESULTS �r/3 Inspection Date: Permit No. or11D Y —o ! /d Project: Address: �7 `C'heck one: �I Regular Inspection: (((❑��` Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Slab Underground Floor Rough -In Underground Rough -In Duct Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 3ot5 wZ f� k--T Inspection ResultsP-Approved LJ AE-Approved with txcepXIDDs u UN-Uisanowea DP -Disapproved / ❑Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspe OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com