Loading...
HomeMy WebLinkAbout218593-2d Compaction signedHeadquarters 1W C IL t ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 17 LVL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: PERMIT #: CONTRACTOR: JOB LOCATION: October 28, 2021 2106-0296 R & E Loader 4005 Avenue T Fort Pierce, Florida KSM JOB #: 218593-2d/BS/jam NUC # 528 Nuc Model: MC-IDR-P Nuc Serial #: MD049528 ITEM TESTED: Compacted Foundation Fill - 3rd/Final Lift TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1 N.E. 0" - 12" 40 106.9 110.3 96.9% 2 S.E. 1 107.4 " 97.4% 3 Center 1 107.1 97.1% 4 S.W. 1 108.0 97.9% 5 N.W. 1 107.6 97.6% Soil Description: Brown Sand In Place Moisture: 9.4 % Proctor Optimum Moisture: 12.0 % Proctor Max. Dry Density: P.C.F. 110.3 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for Unstaked Foundation Respectfully Sub 1p tted: 9 y signed by This item has been electronically signed and Julie Keller sealel by Julie Keller, P.E. EI. Lic. 68366 on the date stated directly to the right using a digital signature. Date: Printed copies of this document are not nsidered signed and sealed and the =gnat'remortbe"ritiedonanyelectronic 2021.10.29 copies. 12:48:23 -04'00' Julie E. Keller, P.E. President PE# 68366 10/29/2021 Email to: mcarthuresther@bellsouth.net 112.0 W I I I I I I I E111.0J—..�.._.I ,_..T.._I.._..�..�.._.,_.._ � � I I I I I H110.0 4-.. -.._.�_.. I ..— T I I I I I I 109.0 P I I I I I I C 108.0 T—..�.._. +.._1._..�..�.._. _.._ F 107.0 _.I_.. fi.._1._..r..y.._.1_.._ I I I I I I I 106.0 -I I_..T.._I._..F..-I.._.i_.._ D I I I I I I I I F 105.0..�.._.�_..t.._�._..r..�.._.�_..� Y 7 8 9 10 11 12 13 14 15 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE