Loading...
HomeMy WebLinkAbout21-139C - Bryn Mawr Condos 2021 - Bldg C - Rep 8 - 10.27.21M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139C Report No. 8 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 3 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. C 5055 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0415 PROJECT NAME: Bryn Mawr Condominiums Concrete Repairs 2021 – Bldg. C DATE: October 27, 2021 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: • Limited access balconies – Units 104 & 506. OBSERVATIONS: Unit 104 • (2) Surface spalls adjacent to the living room sliding glass doors have been repaired. • Loose topping adjacent to the master bedroom sliding glass doors removed and no spalls were found. • The new waterproofing basecoat has been placed at the repaired areas. Unit 506 • Column spall repaired at the south facing sliding glass door. • Loose stucco in wall adjacent to south facing sliding glass door has been removed and replaced, and no spalls were found. RECOMMENDATIONS: • Provide a paint primer on the new stucco at all repaired areas. • Relocate the swing stage to the 05 stack to repair the final two balconies (Units 105 & 805). ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139C Report No. 8 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 2 of 3 Pic 1 – Unit 104 (2) Surface spalls repaired Pic 2 – Unit 104 Loose topping was removed and no spalls were found. Pic 3 – Unit 506 Waterproofing basecoat applied. M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139C Report No. 8 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 3 of 3 Pic 4 – Unit 506 Column spall at the south facing balcony. Pic 5 – Unit 506 Stucco repair.