Loading...
HomeMy WebLinkAboutCreekside Lot 115 Code 650 (2).pdfMUNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS `_ l //� Inspection Date: fi ^ o? Permit No. Project: Address: 9S bb Check one: Regular Inspection: ❑\ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -in Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test CondO&Test Structural Service/Ground Storm Piping & Test InsulSheet Rock Appliance/Equipment Fixtures Wall Roofing Lighting Protection Equipment EquiRe-inspection Re -inspection Re -inspection Re-inFinal Building Final Electrical Final Plumbing Final Other Inspection Type Area Inspected/Code: &6) ` -tl a Inspection Results:VAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conc 1. 2. 3. 4. 5. 6. FA Inspector's Name: Lic.tlAy 79 5Y OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com