Loading...
HomeMy WebLinkAboutCreekside Lot 97 Code 300 (2).pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection/Date: I ' Permit No. Project: Address: Check Check one: XRegular Inspection: ZOT 9 7 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBIWoECHANICAL Footing Underground Undergruct Rough-InSlab Floor Rough -In Rough-Iteam Piping & TestMasonry Wall Rough -In Stack PiW Piping & TestWall/Ceiling Ceiling Rough -In Water PHW Piping & TestFraming Panel/Feeder Gas Pipiond. Piping & TestStructural Service/Ground Storm Pinsulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 3&n k-l� I L) { A ILr�nt Inspection Results:,e_AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 6 S S� 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: XW / vL OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com