HomeMy WebLinkAboutGEORGE WILLIAMS contractCustomer/Owner/Agent:
Project Address:
J.
I �A TAYLut
2 1
ROOFING CONTRACTOR
` Estlnlate/Contract/Pro osal"
%orge Williams Phone: 772.497.4422
123 Beach Avenue Phone 2:
Port St Lucie; FL Fax:
September 25, 202127Sh5/1.2 Email; dw3rd a
A. Taylor Roofing will provide necessa buildin g �gmarr.com
r5 g permits, schedule all ins ctions with related Municipality, and maintain Current License
and Insurance, This proposal includes labor, materials, and all taxes. Please note that "Oil Canning" is a characteristic of all metal roof systems
and is not a cause for rejection. our "Professional" technicians will hereby complete the following;
I. Completely remove existing roofing materials down to sheathing/deck and prepare as needed to ensure a clean, solid
surface in which to apply a new roof.
2. Inspect all sheathing and replace any rotten wood. (Estimate includes up to 3 sheets plywood sheathing replacement at
no charge, for additional lumber replacement costs, see attached sheet).
3. Install 8-D'ring-shank" fasteners to existing sheathing/deck to meet current Building Code requirements.
4. Install (1) ply peel and stick underlayment directly over sheathing, and mechanically fasten using approved fasteners
per code requirements.
5. Install new roofing accessories including: drip edge, flashings, counter-fashings, plumbing stack fleshings, vent
(lashings, and valley metal. (Accessories will he fabricated from 26 Gauge Galvanized materials/standard colors, or
will be made to match metal roofing panels).
6. Seal all penetrations using approved roofing cement and/or sealants.
7. Install new roofing materials/accessories using approved fasteners per code requirements,
8. (Flat/Low-Slope roof areas: Aluminum structures, gutters, skylights etc, not included (See below for options)
9. Satellite dish, Solar panels, etc to be removed by others prior to commencement of work, unless disposing of items.
I0. Thoroughly clean project of all "roofing related debris" and haul away. (Landfill fees are included).
li4Install Architectural Shingles (Lifetime Warranty/130 mph) — —$ 10,125.00
;-V Crimp Metal Roof System (Mill Finish 26 Gauge) —$ 13,500.00
J.A. Ta Ior Roofin will nrii,d,ila a 5 Year "Leak Free" workmanshipwarren from date of coin letion.
Any alteration or deviation from the shove specifications involving additional costs will be executed only upon written orders, and will become
an extra charge over and above the estimate. Replacement of rotten/damaged lumber is not included in estimate unless specified. Customer must
provide access to building unless arrangements are made prior to estimate, therefore J.A. Taylor Roofing is not responsible for damage to
driveway/sidewalks and/or any other access areas needed to approach projects. Any client that is in default in the payment of money due under
terms of this account will be charged at the rate of 1 'h % per month on the unpaid balance, (Maximum allowable by law). If any client is referred
to an attorney for collection, client agrees to pay ali fees incurred in the collection of the amount due, plus all court Posts and attorney Fees. work
will be scheduled upon written acceptance of this proposal. This proposal may be withdrawn from us if not accepted within 60 days. *All major
credit cards accepted, however an additional processing fee of up to 5% will be assessed to contact total depending on current monthly rate and
card used.
Owner: d
Contractor:
Date -
For further assistance please contact J.A. Taylor Roofing 772-4664040 or fax to 772-468-8397
Thank you for the opportunity to bid your project!
********* Serving the Treasure Coast for over 50 Years ***********
Respectfully Submitted bv: Jack NIU
Cell 1771,170,9011
Al
.�-► f
302 Melton Drive Fort Pierce, FL 34982 Tel, 772.466.4040 Fax 772.468.8397
REPAIRS, RE -ROOFS, NEW COMMERCIAL & RESIDENTIAL ROOFING CONTRACTORS
SERVING FLORIDA SINCE 1965
LICENSE #CCC1325720